40
Figure 26: Boiler Display
IX. OPERATION (continued)
The control display, along with Up
ñ
, Down
ò
, and
“
I
”
keys may be used to view boiler operating status (Figure 26).
D.
VIEWING THE OPERATING MODE OPTIONS
In operating mode the user may view (but not change) boiler
operating status, settings and troubleshooting information.
To view control display information:
1. Press and release the
“
I
”
key on the control to
change from one parameter to the next. Each setting
will alternately flash between the relevant display
code and its corresponding value.
Operating Mode Options
StA
Status
bt
Boiler Temperature
SP
Operating Setpoint (Outdoor Reset)
HL
High Limit Setting
HdF
High Limit Differential
tt
Heat Request Status
dh
DHW Heat Request Status
FLA
Flame Current
rUn
Run Time Hours
CYC
Boiler Cycles
Err
Error (see Error Numbers)
The
STA
(status) display code has the below listed values.
This list is also available on the control cover.
Status Code Displayed in
STA
Mode
1 Standby
2 Waiting for Pressure Switch to Open
3 Waiting for Pressure Switch to Close
4 Prepurge
6 Spark
7 Flame Proving
8 Running
10 Retry/Recycle Delay
11 Pressure Switch Failed to Open
12 Pressure Switch Failed to Close
13 Soft Lockout
14 Hard Lockout
15 Waiting for Limit to Close
16
Flame Present Out of Sequence
17 Self Test
For example, when the “
I
” key is pressed on the control
until “
bt
” is displayed, it will then flash a three digit
number (such as “
180
”) followed by either “
F
” (or “
C
”).
This indicates that the boiler water temperature is
180°F.
Other operating parameters display the information in a
similar fashion.
Unit Display
OR
Sample
Display
1
sec
1
sec
1
sec
Please note that in operating mode to hold the display on
the value the user can press and hold either the Up
ñ
or
Down
ò
keys and the value will be continuously shown.
This may be helpful in watching a value “live”.
Summary of Contents for PVG3
Page 14: ...14 Figure 4 Horizontal Vent Installation III Venting continued...
Page 16: ...16 Figure 7 Attic Offset Figure 6 Vertical Vent Installation III Venting continued...
Page 29: ...29 Figure 17 Wiring Connection Diagram VI Electrical continued...
Page 31: ...31 Figure 19 Circulator Zoned System Wiring Diagram VI Electrical continued...
Page 32: ...32 Figure 20 Zone Valve Zoned System Wiring Schematic VI Electrical continued...
Page 34: ...34 Figure 21 Modular Boiler Piping VII Modular Installation continued...
Page 36: ...36 Figure 22 Operating Instructions VIII System Start up continued...
Page 51: ...51 Figure 29 Flue and Burner Cleanout 1 Burner XI Service continued...
Page 54: ...54 XII Repair Parts continued...
Page 56: ...56 XII Repair Parts continued...
Page 60: ...60 XII Repair Parts continued...
Page 67: ...67 SERVICE RECORD DATE SERVICE PERFORMED...
Page 68: ...68 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net...