C.
Pressure test.
The boiler and its gas connection must
be leak tested before placing boiler in operation.
1. Protect boiler gas control valve. For all testing over
½ psig, boiler and its individual shutoff valve must
be disconnected from gas supply piping. For testing
at ½ psig (3.5kPa) or less, isolate boiler from gas
supply piping by closing boiler’s individual manual
shutoff valve.
2. Locate leaks using approved combustible gas
detector, soap and water, or similar nonflammable
solution.
DANGER
Do not use matches, candles, open flames or
other ignition source to check for leaks.
V. GAS PIPING (continued)
Summary of Contents for PVG3
Page 14: ...14 Figure 4 Horizontal Vent Installation III Venting continued...
Page 16: ...16 Figure 7 Attic Offset Figure 6 Vertical Vent Installation III Venting continued...
Page 29: ...29 Figure 17 Wiring Connection Diagram VI Electrical continued...
Page 31: ...31 Figure 19 Circulator Zoned System Wiring Diagram VI Electrical continued...
Page 32: ...32 Figure 20 Zone Valve Zoned System Wiring Schematic VI Electrical continued...
Page 34: ...34 Figure 21 Modular Boiler Piping VII Modular Installation continued...
Page 36: ...36 Figure 22 Operating Instructions VIII System Start up continued...
Page 51: ...51 Figure 29 Flue and Burner Cleanout 1 Burner XI Service continued...
Page 54: ...54 XII Repair Parts continued...
Page 56: ...56 XII Repair Parts continued...
Page 60: ...60 XII Repair Parts continued...
Page 67: ...67 SERVICE RECORD DATE SERVICE PERFORMED...
Page 68: ...68 U S Boiler Company Inc P O Box 3020 Lancaster PA 17604 1 888 432 8887 www usboiler net...