16
103536-13 - 2/24
MegaSteam
Installation & Service Manual
Figure 2-8: Purpose of Tappings and Bosses
Tapping
Location
Size, NPT
Boss
Location
Thread Size
UNC
Steam Boiler
Less Heater
With Heater
A
¼ in. - 18
Pressure Gauge
B
¼ in. - 18
Pressure Limit
C
¾ in. - 14
Probe LWCO - Std.
D
½ in. - 14
Water Gauge Glass
E
2 in. - 11½ in.
Supply (Front & Rear Tappings)
F
¾ in. - 14
Safety Valve
G
1½ in. - 11½
Condensate Return
H
1¼ in. - 11½
Optional Front Return
J
1½ in. - 11½
Surface Blowoff (Plugged)
K
1 in. - 11½
Indirect Water Heater Supply
L
½ in. - 14
Indirect Water Heater Limit
M (4 pcs)
5/16 in. - 18
Jacket Front Panel, Burner Swing Door Mounting
Bracket
N (2 pcs)
3/8 in. - 16
Burner Swing Door
P (10 pcs)
5/16 in. - 18
Jacket Rear Panel, Smoke Box Collar, Cleanout
Covers
Q
¼ in. - 18
Smokebox Pressure Tapping
R
½ in. -14
L4006
Operating
Control
Plugged
Table 2-9: Purpose Of Tapping & Bosses
2
Unit-Pak Boiler Assembly
(continued)