37
110328-04 - 2/23
ALTA
Installation, Operating & Service Instructions
Boiler
Model
Boiler Supply
Connection
inch, FPT
Boiler Return
Connection
inch, FPT
ΔT = 35°F
ΔT = 30°F
ΔT = 25°F
ΔT = 20°F
Minimum
Required
Flow
(GPM)
Boiler
Head
Loss,
(Ft.)
Minimum
Required
Flow
(GPM)
Boiler
Head
Loss,
(Ft.)
Minimum
Required
Flow (GPM)
Boiler
Head
Loss,
(Ft.)
Minimum
Required
Flow
(GPM)
Boiler
Head
Loss,
(Ft.)
ALTA-080
1
1
4.3
7.2
5.0
9.5
6.0
13.1
7.5
19.8
ALTA-120
ALTA-120B
1
1
6.4
11.2
7.5
14.6
9.0
20.0
11.2
29.7
ALTA-150
1
1
8.1
8.2
9.4
10.9
11.3
15.3
14.1
23.4
ALTA-180
1
1
9.7
11.6
11.3
15.5
13.5
21.8
16.9
33.5
Notes:
1. Required Flow (GPM) = **Output (MBH) x 1,000/(500 x ΔT)
**Output (MBH) - select value for specific boiler model from Table 3-1. Using boiler antifreeze will result in higher pressure drop
and may require larger circulators.
2. Boiler head loss includes 50 eq ft. near boiler piping. [Approximately 20 ft. straight pipe, (4) 90° elbows and (2) full port ball
valves]
10
Heating System Piping
(continued)
Figure 10-2: System Curve w/ 50 Equivalent ft. of Piping