USER GUIDE
u-line.com
Reference Diagrams
6.
At the back of the unit,
squeeze grommet on
power cord and push cord
through opening.
7.
Take out 14 screws to
remove upper and lower
back panels.
8.
On top of reservoir,
disconnect waterline
coming from inlet valve.
9.
Loosen hose clamp and disconnect ice transport tube,
remove hose clamp.
10.
Loosen hose clamp and disconnect drain tube, remove
hose clamp.
11.
Cut cable tie from wires and disconnect bin thermistor
wire (BIN TEMP).
12.
Disconnect cabinet from base.
a. Remove 3 screws from each side of cabinet
b. Remove 2 1⁄4” screws from metal shroud
13.
Pull base away from cabinet.
9
8
10
11
a
a
b
b
b
39