PAGE 2 OF 6
0223 IH-10477
INSTALLATION
Figure 1
Figure 2
1-800-295-5510
uline.com
Screw Cover Base
Screw
Screw Cover
1. Remove baby changing station from shipping
carton and check for damage.
2. Place unit onto counter surface and place in
desired position. Using the mounting holes as a
guide, mark the screw hole locations with a pencil.
(See Figure 1)
3. Remove changing station and drill holes 3/4" deep
with 1/8" diameter drill bit.
NOTE: If drilling into marble or granite, a larger
drill bit may be necessary.
4. Align mounting holes in changing station with
previously drilled holes. Insert screw through screw
cover base and into previously drilled holes. Tighten
screws into countertop to secure. (See Figure 2)
5. Snap screw cover onto screw cover base.
(See Figure 2)
6. Repeat steps 4 and 5 for remaining screw holes.
7. Apply a suitable water sealant such as silicone
around the base of the unit.