![U-Line 0820 Manual Download Page 4](http://html.mh-extra.com/html/u-line/0820/0820_manual_830882004.webp)
PAGE 4 OF 27
0820 IH-7242
SETTING UP THE DEVICE
ASSEMBLY OF THE FILM ROLL HOLDER
1. Remove the machine
and the blue film roll
shaft from the box.
Insert the metal part
into hole on the front
side of the machine.
(See Figure 1)
Uline Air Cushion Machine films are available in three
different options:
DESCRIPTION
ULINE
PART NO.
CUSHION SIZE
SPACING GUIDE
Air Pillows
S-22467
8 x 4"
11/16
"
Air Cushion
S-22468
1⁄ x 9 x 13"
1/2
"
Bubble Film
S-22469
3/4 x 6 x 13"
1/2
"
2. Adjust the film roll
holder to fit desired
film type by loosening
the screw on the right
side of the machine
with included Allen
wrench. Gently
tighten screw to
secure. (See Figure 2)
NOTE: Screw on right side of machine is set into
machine housing. It should be loosened and
tightened to adjust film roll holder and does
not need to be removed for this process.
3. Using the included
spacing gauge can
help find the right
setting for each film
type. (See Figure 3)
• Air Pillows = 11/16"
• Air Cushion = 1/2"
• Bubble Film = 1/2"
4. Tighten screw to
secure film roll holder.
LOADING A FILM ROLL
1. Slide the film roll onto the
film roll holder. Ensure that
the film is oriented to unwind
from the underside of the
roll. (See Figure 4)
2. There is a gap between
the edge of the film and
the perforations. Cut a little
corner off the film gap.
(See Figure 5)
3. Turn the unlock knob
clockwise to unlock the top
sealing unit. Slide the film
between the guide bars
and thread the gap on
the film through the black
nozzle and between the
sealing units. Ensure the
film cuts on the blade, and
advance the film all the
way through the sealing units. (See Figure 6)
4. Turn unlock knob
counterclockwise to lock
the top sealing unit. Always
make sure that the knob is
locked before operating the
machine. (See Figure 7)
Figure 1
Figure 4
Figure 5
Figure 6
Figure 7
Figure 2
Figure 3
1/2"
11/16"
15/16"