background image

TFP1253

Page 5 of 8

G

G

L1 N N N

NITROGEN GENERATOR 

RUNNING OUTPUT

BYPASS MODE ALARM 

OUTPUT

LEAK MONITORING OUTPUT

POWER ON/OFF OUTPUT

NITROGEN SUPPLY 

LINE PRESSURE 

OUTPUT

230 VAC/ 

SINGLE PHASE/ 

50 HZ 

CONNECTIONS

PRESSURE  

SWITCH

INCOMING  

POWER 

FUSE

BOX

BUILDING  

MANAGEMENT 

SYSTEM 

MONITORING 

POINTS

POWER  

SUPPLY

POWER  

DISTRIBUTION

120 VAC/

SINGLE PHASE

60 HZ

CONNECTIONS

NITROGEN GENERATOR 

RUNNING OUTPUT

BYPASS MODE ALARM 

OUTPUT

LEAK MONITORING OUTPUT

POWER ON/OFF OUTPUT

NITROGEN SUPPLY 

LINE PRESSURE 

OUTPUT

L1

N

G

PRESSURE  

SWITCH

INCOMING  

POWER 

FUSE

BOX

BUILDING  

MANAGEMENT 

SYSTEM 

MONITORING 

POINTS

POWER  

SUPPLY

POWER  

DISTRIBUTION

L1

G

N N N

G

FIGURE 2A 

MODEL NG-1 1150, NG-1 1500, NG-1 2000, AND NG-1 3000 STAND-ALONE NITROGEN GENERATOR 

AMERICAS SYSTEM SIGNAL MONITOR AND POWER SUPPLY CONNECTION

L1

N

G

FIGURE 2B 

MODEL NG-1 1150, NG-1 1500, NG-1 2000, AND NG-1 3000 STAND-ALONE NITROGEN GENERATOR 

EMEA AND APAC SYSTEM SIGNAL MONITOR AND POWER SUPPLY CONNECTION

Summary of Contents for NG-1 1150

Page 1: ...to TFP1262 for more information on TYCO Dry Air Vent TAV D and to TFP1263 for more information on TYCO SMART Air Vent TSV D System Assembly The TYCO Nitrogen Generator unit includes the following comp...

Page 2: ...605 1150 4353 2300 8706 NG 1 1500 24 3 688 11000 41640 1440 5451 2880 10902 NG 1 2000 24 688 18500 70030 2025 7666 4050 15331 NG 1 3000 35 992 22500 85172 2900 10978 5800 21955 Notes a Capacity based...

Page 3: ...l Cabinet Dimensions See Table A Weight See Table A Operating Performance See Table B Temperature Range 40 F 5 C to 105 F 40 C Power Supply 120 VAC Single 1 phase 60Hz dedicated circuit 230 VAC Single...

Page 4: ...panel for wall mount ing using standard anchors Step 2 Power Supply The Nitrogen Generator requires a ded icated power supply that connects to the terminal blocks in the nitrogen gen erator cabinet Se...

Page 5: ...ENERATOR RUNNING OUTPUT BYPASS MODE ALARM OUTPUT LEAK MONITORING OUTPUT POWER ON OFF OUTPUT NITROGEN SUPPLY LINE PRESSURE OUTPUT L1 N G PRESSURE SWITCH INCOMING POWER FUSE BOX BUILDING MANAGEMENT SYST...

Page 6: ...compressors in EMEA and APAC the air discharge plumb ing should first be connected to the WSD 25 water separator which then is to be connected to the inlet of the nitro gen generator Step 4 Plumb the...

Page 7: ...gen separation membrane will provide up to 20 years of service life Filter Replacement Procedure With reference to Figure 4 perform the following steps when replacing the cartridge filters located in...

Page 8: ...10 Close the depressurization ball valve The Nitrogen Generator can now be placed back into service Step 11 Turn the power supply to the unit ON Step 12 Close the Bypass Ball Valve Step 13 Open the In...

Reviews: