Accelerator

The optional TYCO Model ACC-1 

Dry Pipe Valve Accelerator is a quick 

opening device that is intended to 

reduce the time for valve operation fol-

lowing the operation of one or more 

automatic sprinklers. The Model ACC-1 

Accelerator automatically adjusts to 

both small and slow changes in system 

pressure, but trips when there is a rapid 

and steady drop in pressure (as in the 

case of a sprinkler operation). Upon 

tripping, the Accelerator transmits 

system air pressure to the intermediate 

chamber of the Model DPV-1 Dry Pipe 

Valve. This neutralizes the differen-

tial pressure holding the Model DPV-1 

Dry Pipe Valve closed and permits it 

to open.
The Model ACC-1 Dry Pipe Valve 

Accelerator has a unique, positive 

action, internal anti-flood device and 

a ball float which combine to prevent 

water and water borne debris from 

entering the more sensitive operating 

areas of the accelerator. The anti-flood 

device seals and latches immediately 

upon operation of the Model ACC-1 Dry 

Pipe Valve Accelerator without waiting 

for a pressure build-up in the intermedi-

ate chamber of the Dry Pipe Valve. The 

latching feature keeps the anti-flood 

device sealed, even while the system 

is being drained. The ball float seals the 

pilot chamber inlet port if there is an 

inadvertent trip of the Dry Pipe Valve, 

due for example, to an air compressor 

failure combined with a slow loss in 

system air pressure due to a leak.

NOTICE

The Model DPV-1 Dry Pipe Valves and 

Model ACC-1

 

Dry Pipe Valve Accelera-

tors described herein must be installed 

and maintained in compliance with this 

document and the standards recog-

nized by the Approval agency, in addi-

tion to any other authorities having 

jurisdiction. Failure to do so may impair 

the performance of these devices.
The owner is responsible for maintain-

ing their fire protection system and 

devices in proper operating condition. 

The installing contractor or manufac-

turer should be contacted with any 

questions.

General 

Description

Dry Pipe Valve

The TYCO Model DPV-1 Dry Pipe Valve 

is a differential valve for automatically 

controlling the flow of water into dry 

pipe fire protection sprinkler systems 

upon operation of one or more auto-

matic sprinklers. The Model DPV-1 Dry 

Pipe Valve also provides for actuation 

of fire alarms upon system operation. 

The valve is available in four sizes: 

DN65, DN80, DN100, and DN150.
Features for the Model DPV-1 Dry Pipe 

Valve are as follows:
•  External reset
•  16 bar pressure rating
•  Unique offset single clapper design 

enabling a simple compact valve to 

minimize installation labor

•  Ductile iron construction to ensure 

a lightweight valve to minimize ship-

ping cost

•  A variety of inlet and outlet 

connections

•  Simple reset procedure through the 

elimination of priming water

Dry pipe sprinkler systems are used 

in unheated warehouses, parking 

garages, store windows, attic spaces, 

loading docks, and other areas 

exposed to freezing temperatures, 

where water filled pipe cannot be uti-

lized. When set for service, the dry 

pipe sprinkler system is pressurized 

with air (or nitrogen). The loss of pres-

sure through an operated automatic 

sprinkler in response to heat from a 

fire permits the Model DPV-1 Dry Pipe 

Valve to open and allow a flow of water 

into the sprinkler system piping. Table 

B establishes the minimum required 

system air pressure that includes a 

safety factor to help prevent false oper-

ations that occur due to water supply 

fluctuations.

Nominal 

Valve 

Size

Alarm 

Test 

Valve

With 

Accelerator Figure

DN65

Three 

Way

7

13

Standard

10

16

DN80

Three 

Way

7

13

Standard

10

16

DN100

Three 

Way

8

14

Standard

11

17

DN150

Three 

Way

12

15

Standard

10

18

TABLE A 

EUROPEAN CONFORMITY 

VALVE TRIM CONFIGURATIONS

Summary of Contents for ACC-1

Page 1: ...recog nized by the Approval agency in addi tion to any other authorities having jurisdiction Failure to do so may impair the performance of these devices The owner is responsible for maintain ing their fire protection system and devices in proper operating condition The installing contractor or manufac turer should be contacted with any questions General Description Dry Pipe Valve The TYCO Model D...

Page 2: ...Subassembly c NO DESCRIPTION REF Clapper Assembly Repair Parts Kit Reset Plunger Parts Kit Includes Items 11 18 Includes Items 6 10 Includes Items 4 7 14 15 18 CH DN100 Valve Valves DN65 DN80 Valves DN100 Valve 92 312 2 203 92 312 2 403 DN65 DN80 Valves DN100 Valve 92 312 1 204 92 312 1 404 DN65 DN80 Valves 1 4 20 UNC x 1 2 Socket Head Cap a Screw DN100 Valve NR Not Replaceable CH Common Hardware ...

Page 3: ... Corning FS3452 b or c Grease 1 5 g Flourosilicone NO DESCRIPTION REP PART NR Air Seal O Ring Socket Head Cap Screw NR 3 8 16 UNC x 1 NO DESCRIPTION REP PART Air and Water Water Seal O Ring NR Valve Body NR NO DESCRIPTION REP PART NR Seat NR Not Replaceable CH Common Hardware Clapper Assembly Repair Parts Kit Reset Plunger Parts Kit Includes Items 14 21 Includes Items 9 13 Includes Items 7 10 17 1...

Page 4: ...inte nance Device high pressure reduc ing type Refer to Technical Data Sheet TFP1241 Quick Opening Device As an option the Model DPV 1 Dry Pipe Valve may be acquired with the Model ACC 1 Dry Pipe Valve Acceler ator See Figure 4 The Model ACC 1 Dry Pipe Valve Accelerator is used to reduce the time to valve actuation fol lowing the operation of one or more automatic sprinklers Operating Principles D...

Page 5: ...er there is a rapid and steady drop in system that is Inlet and Pilot Chamber pressure the pressure in the Differential Chamber reduces at a substantially lower rate This condi tion creates a net downward force on the Plunger which rotates the Lever As the Lever is rotated see Figure 6 the Relief Valve is raised out of the Relief Port and the Anti Flood Valve is depressed downward into the Pilot C...

Page 6: ...N WATER SUPPLY SHUT OFF OPERATED POSITION CLAPPER LATCH PIVOTS TO UNLATCH CLAPPER ASSEMBLY FROM WATER SUPPLY WATERFLOW TO SYSTEM CLAPPER LATCH PIVOTS TO ALLOW CLAPPER ASSEMBLY TO FULLY OPEN ALARM PORT OPEN TO ATMOSPHERE RESET KNOB DRAIN FROM SYSTEM COMPLETE DRAIN FROM SYSTEM CLAPPER ASSEMBLY IN SET POSITION PUSH HERE TO RESET VALVE INTERMEDIATE CHAMBER WATER SEAT VALVE WATERWAY CLAPPER ASSEMBLY AL...

Page 7: ...ERFLOW TO ALARM WATER SUPPLY SHUT OFF CLAPPER LATCH PIVOTS TO UNLATCH CLAPPER ASSEMBLY FROM WATER SUPPLY WATERFLOW TO SYSTEM CLAPPER LATCH PIVOTS TO ALLOW CLAPPER ASSEMBLY TO FULLY OPEN ALARM PORT OPEN TO ATMOSPHERE RESET KNOB DRAIN FROM SYSTEM COMPLETE DRAIN FROM SYSTEM CLAPPER ASSEMBLY IN SET POSITION PUSH HERE TO RESET VALVE INTERMEDIATE CHAMBER WATER SEAT VALVE WATERWAY CLAPPER ASSEMBLY ALARM ...

Page 8: ... See b 20 Relief Valve Seat 1 See b 21 O Ring 1 See b 22 Seal Washer 1 See b 23 Latch 1 See a 24 Fillister Hd Machine Screw 1 4 20 UNC x 1 1 2 8 See c 25 Plug Seat 1 See c 26 O Ring 1 See c 27 O Ring 1 See a 28 Reset Knob 1 See c 29 Anti Flood Seat Assembly w Ball Float 1 See b 29a Insert 1 29b Seal 1 29c Guide 1 29d Ball 1 29e Clip 1 29f O Ring 1 Requires thin film of FS3452 Fluorosilicone Grease...

Page 9: ...T INLET CHAMBER 1 2 NPT OUTLET PILOT CHAMBER EXHAUST VALVE OUTLET CHAMBER RELIEF VALVE ANTI FLOOD VALVE PLUNGER LEVER LATCH RESET KNOB RELIEF PORT FROM SYSTEM PIPING TO DRY PIPE VALVE INTERMEDIATE CHAMBER FIGURE 5 MODEL ACC 1 DRY PIPE VALVE ACCELERATOR IN SET POSITION FIGURE 6 MODEL ACC 1 DRY PIPE VALVE ACCELERATOR IN TRIPPED POSITION ...

Page 10: ...temporarily plugged and the Handhole Cover Bolts are to be tightened using a cross draw sequence Valve Setting Procedure Perform this procedure when initially setting the Model DPV 1 Dry Pipe Valve after an operational test of the fire protection system or after system operation due to a fire See Figures 7 to 18 as applicable for the given riser arrangement and proceed as follows Step 1 Close the ...

Page 11: ... Continue this procedure until drain back water is no longer present Care and Maintenance The following procedures and inspec tions should be performed as indicated in addition to any specific require ments of any authority having jurisdic tion Impairments must be immediately corrected The owner is responsible for the inspection testing and maintenance of their fire protection system and devices i...

Page 12: ...Handhole Cover Gasket and Handhole Cover in proper orien tation with valve body Ref Figure 1 and hold in place b Apply LOCTITE No 242 or equiv alent to Hex Bolt threads c Insert Hex Bolts through Hand hole Cover Gasket and Handhole Cover hand tighten into valve body d Using crossdraw sequence to assure uniformity wrench tighten Hex Bolts to appropriate torque values Ref Table D e Inspect to assure...

Page 13: ...1 1 2 Self Closing Drain Valve Pipe Nipple 1 1 2 BSP Thd x 150 mm Reducing Tee 1 1 2 x 1 1 2 x 1 2 BSP Female Thd Pipe Nipple 1 2 BSP Thd x 100 mm Pipe Nipple 3 4 BSP Thd x 100 mm Water Pressure Gauge 300 PSI 21 bar Check Valve DN15 Male Thd x DN15 Female Thd Model DPV 1 Dry Pipe Valve Groove x Groove Ball Valve DN15 with m5 Vent Hole Pipe Nipple 1 2 BSP Thd x 180 mm Pipe Nipple DN65 Valve 1 2 BSP...

Page 14: ...alve DN20 Thd Ball Valve DN50 Thd Elbow WES 3 mm m5 Pressure Alarm Switch PS10 1 1 2 Self Closing Drain Valve Pipe Nipple 2 BSP Thd x 120 mm Reducing Tee 2 x 2 x 1 2 BSP Female Thd Pipe Nipple 1 2 BSP Thd x 100 mm Pipe Nipple 3 4 BSP Thd x 100 mm Water Pressure Gauge 300 PSI 21 bar Check Valve DN15 Male Thd x DN15 Female Thd Model DPV 1 Dry Pipe Valve DN100 Groove x Groove Ball Valve DN15 with m5 ...

Page 15: ...rain Valve Ball Valve DN50 Thd Ball Valve DN20 Thd Ball Valve DN15 Thd Pressure Alarm Switch PS10 1 Pipe Nipple 3 4 BSP Thd x 120 mm Pipe Nipple 2 BSP Thd x 100 mm Pipe Nipple 1 2 BSP Thd x 100 mm Reducing Tee 2 x 2 x 1 2 BSP Female Thd Ball Valve DN15 with m5 Vent Hole Model DPV 1 Dry Pipe Valve DN150 Groove x Groove Pipe Nipple 1 2 BSP Thd x 60 mm Pipe Nipple 1 2 BSP Thd x 180 mm Water Pressure ...

Page 16: ...le 1 1 2 BSP Thd x 150 mm Pipe Nipple 3 4 BSP Thd x 100 mm Pipe Nipple DN65 Valve 1 2 BSP Thd x 120 mm Ball Valve DN15 with m5 Vent Hole Check Valve DN15 Male Thd x DN15 Female Thd Water Pressure Gauge 300 PSI 21 bar Reducing Tee 1 1 2 x 1 1 2 x 1 2 BSP Female Thd ETEMEFN ETDDMN ETDMDFN ATDMCON ATDFCON ETDDFN TTDDMDFN TTDDDFN V923221002 TTDMDDFN PTDN RTDMBFN MANIF3WAY RTDMEFN RTEMDFN 2162156 0260 ...

Page 17: ...10 1 1 2 Self Closing Drain Valve Anti Flood Fitting 3 32 Restriction Pipe Nipple 2 BSP Thd x 120 mm Pipe Nipple 3 4 BSP Thd x 100 mm Pipe Nipple 1 2 BSP Thd x 100 mm Ball Valve DN15 with m5 Vent Hole Check Valve DN15 Male Thd x DN15 Female Thd Water Pressure Gauge 300 PSI 21 bar Reducing Tee 2 x 2 x 1 2 BSP Female Thd Model DPV 1 Dry Pipe Valve DN100 Groove x Groove ETEMEFN ETDDMN ETDMDFN ATDMCON...

Page 18: ...0 1 Ball Valve DN15 Thd Ball Valve DN20 Thd Ball Valve DN50 Thd Ball Valve DN15 with m5 Vent Hole Pipe Nipple 2 BSP Thd x 100 mm Pipe Nipple 1 2 BSP Thd x 120 mm Model DPV 1 Dry Pipe Valve DN150 Groove x Groove Reducing Tee 2 x 2 x 1 2 BSP Female Thd Water Pressure Gauge 300 PSI 21 bar Check Valve DN15 Male Thd x DN15 Female Thd Anti Flood Fitting 3 32 Restriction ETEEMN ETDMDFN ATDMCON ATDDMN ATD...

Page 19: ...0 PSI 21 bar Pressure Alarm Switch PS10 1 Ball Valve DN20 Thd Ball Valve DN15 Thd Ball Valve DN40 Thd Elbow WES 3 mm m5 Pipe Nipple 1 2 BSP Thd x 60 mm Pipe Nipple 1 2 BSP Thd x 180 mm Pipe Nipple 3 4 BSP Thd x 100 mm Pipe Nipple 1 2 BSP Thd x 100 mm Pipe Nipple 1 1 2 BSP Thd Air Pressure Gauge 250 PSI Ball Valve DN15 with m5 Vent Hole Reducing Tee 1 1 2 x 1 1 2 x 1 2 BSP Female Thd Adapter Fittin...

Page 20: ...oove x Groove Model ACC 1 Dry Pipe Valve Accelerator Check Valve DN15 Male Thd x DN15 Female Thd 1 2 Self Closing Drain Valve Water Pressure Gauge 300 PSI 21 bar Pressure Alarm Switch PS10 1 Ball Valve DN20 Thd Ball Valve DN15 Thd Ball Valve DN50 Thd Elbow WES 3 mm m5 Pipe Nipple 1 2 BSP Thd x 180 mm Pipe Nipple 2 BSP Thd x 120 mm Pipe Nipple 3 4 BSP Thd x 100 mm Pipe Nipple 1 2 BSP Thd x 100 mm P...

Page 21: ... x DN20 Female Thd Elbow DN15 Male Thd x DN15 Female Thd Adapter Fitting DN15 x DN15 Male Thd Pipe Nipple 1 BSP Thd x 80 mm Elbow DN15 x DN15 Male Thd Copper Tube 15 x 1 mm Type D Reducer DN20 Female Thd x DN15 Male Thd Adapter Tee DN15 x DN15 x DN15 Female Thd Pressure Relief Hose Transparent 3 x 6 x 1 2 m Copper Tube 15 x 1 mm Type C Ball Valve 3 way 1 2 BSP Copper Tube 15 x 1 mm Type B Adapter ...

Page 22: ...lve 1 2 BSP Thd x 120 mm Model ACC 1 Dry Pipe Valve Accelerator Anti Flood Fitting 3 32 Restriction Ball Valve DN15 with m5 Vent Hole Reducing Tee 1 1 2 x 1 1 2 x 1 2 BSP Female Thd Air Pressure Gauge 250 PSI Pipe Nipple 1 1 2 BSP Thd Pipe Nipple 3 4 BSP Thd x 100 mm Pipe Nipple 1 1 2 BSP Thd x 150 mm Pipe Nipple 1 2 BSP Thd x 60 mm Plug 3 4 BSP Thd 406012 025500013 305105 0260 2162156 1610000480 ...

Page 23: ...e Alarm Switch PS10 1 Water Pressure Gauge 300 PSI 21 bar Ball Valve DN50 Thd Ball Valve DN20 Thd Ball Valve DN15 Thd Pipe Nipple 1 2 BSP Thd x 100 mm Model ACC 1 Dry Pipe Valve Accelerator Anti Flood Fitting 3 32 Restriction Ball Valve DN15 with m5 Vent Hole Reducing Tee 2 x 2 x 1 2 BSP Female Thd Air Pressure Gauge 250 PSI Pipe Nipple 2 BSP Thd Pipe Nipple 3 4 BSP Thd x 100 mm Pipe Nipple 2 BSP ...

Page 24: ...Male Thd Elbow DN20 Male Thd x DN20 Male Thd Elbow DN15 Male Thd x DN15 Female Thd Pressure Relief Hose Transparent 3 x 6 x 1 2 m Spring Loaded Check Valve 1 2 NPT Adapter Tee DN15 x DN15 x DN15 Female Thd Reducer DN20 Female Thd x DN15 Male Thd Copper Tube 1 mm x 1 m Manifold Adapter Tee Adapter Tee ETEMEFN ETDDMN ATDMCON ATDFCON ETDMCON ETDMDFN ETEEMN TTDDMDFN TTDDDFN RTDMBFN RTDMEFN MANIF3WAY V...

Page 25: ...PSWITCHBI2DN15 Air Pressure Relief Valve Factory set at 3 1 bar 92 343 1 020 Model WMA 1 Water Motor Alarm Red Finish Gong 52 630 1 021R A through Z Labels for Attaching to Valve Components WS00000033 Supervisory Switch for Alarm Test Shut off Valve WS00000011 Low Pressure Switch Kit CEDPV1LPS SIZE 0 DN65 73 0 mm 3 DN80 88 9 mm 4 DN100 114 3 mm 6 DN150 168 3 mm 7 165 1 mm TRIM 88 EUR FM with Three...

Page 26: ...otection Association LOCTITE is a registered trademark of Henkel Corporation 1400 Pennbrook Parkway Lansdale PA 19446 Telephone 1 215 362 0700 2020 Johnson Controls All rights reserved All specifications and other information shown were current as of document revision date and are subject to change without notice ...

Page 27: ...alves after water ceases to discharge and leave the Main Drain Valve F open Step 2 Place the Three Way Alarm Control Valve E in the open position Step 3 Replace the sprinklers that have operated and the sprinklers close to the fire Step 4 Push down on the reset knob P to allow the Dry Pipe Valve D to re seat Step 5 Via the Air Supply Control Valve K pressurize the system with air to 0 7 bar and th...

Page 28: ...in Valve F open Step 2 Place the Three Way Alarm Control Valve E in the open position Step 3 Replace the sprinklers that have operated and the sprinklers close to the fire Step 4 Push down on the reset knob P to allow the Dry Pipe Valve D to re seat Step 5 Via the Air Supply Control Valve K pressurize the system with air to 0 7 bar and then open and close each auxiliary drain valves in the sys tem...

Page 29: ...in Valve F open Step 2 Place the Three Way Alarm Control Valve E in the open position Step 3 Replace the sprinklers that have operated and the sprinklers close to the fire Step 4 Push down on the reset knob P to allow the Dry Pipe Valve D to re seat Step 5 Via the Air Supply Control Valve K pressurize the system with air to 0 7 bar and then open and close each auxiliary drain valves in the sys tem...

Page 30: ...alve E verify that the alarm signal created by the Waterflow Pressure Alarm Switch M is visible at the fire panel If appli cable check the sound of the Water Motor Alarm it must be clear and steady Step 2 Close the Alarm Test Valve E verify that the normal supply and sys tem pressures are restored If the sup ply pressure is below the normal use the instructions from the water supply to obtain the ...

Page 31: ...e Alarm Switch M is visible at the fire panel If appli cable check the sound of the Water Motor Alarm it must be clear and steady Step 2 Close the Alarm Test Valve E verify that the normal supply and sys tem pressures are restored If the sup ply pressure is below the normal use the instructions from the water supply to obtain the usual pressure Step 3 Close the Pressure Switch Valve J and verify o...

Page 32: ... discharge and leave the Main Drain Valve F open Step 2 Replace the sprinklers that have operated and the sprinklers close to the fire Step 3 Push down on the reset knob P to allow the Dry Pipe Valve D to re seat Step 4 Via the Air Supply Control Valve K pressurize the system with air to 0 7 bar and then open and close each auxiliary drain valves in the sys tem piping to drain any remaining water ...

Page 33: ... IV Placing the System Back in Service Step 1 Close the auxiliary drain valves after water ceases to discharge and leave the Main Drain Valve F open Step 2 Place the Three Way Alarm Control Valve E in the open position Step 3 Replace the sprinklers that have operated and the sprinklers close to the fire Step 4 Push down on the reset knob P to allow the Dry Pipe Valve D to re seat Step 5 Via the Ai...

Page 34: ...drain valves after water ceases to discharge and leave the Main Drain Valve F open Step 2 Place the Three Way Alarm Control Valve E in the open position Step 3 Replace the sprinklers that have operated and the sprinklers close to the fire Step 4 Push down on the reset knob P to allow the Dry Pipe Valve D to re seat Step 5 Via the Air Supply Control Valve K pressurize the system with air to 0 7 bar...

Page 35: ...drain valves after water ceases to discharge and leave the Main Drain Valve F open Step 2 Place the Three Way Alarm Control Valve E in the open position Step 3 Replace the sprinklers that have operated and the sprinklers close to the fire Step 4 Push down on the reset knob P to allow the Dry Pipe Valve D to re seat Step 5 Via the Air Supply Control Valve K pressurize the system with air to 0 7 bar...

Page 36: ... cross mains and branch lines are drained IV Placing the System Back in Service Step 1 Close the auxiliary drain valves after water ceases to discharge and leave the Main Drain Valve F open Step 2 Replace the sprinklers that have operated and the sprinklers close to the fire Step 3 Push down on the reset knob P to allow the Dry Pipe Valve D to re seat Step 4 Via the Air Supply Control Valve K pres...

Page 37: ...rvice Step 1 Close the auxiliary drain valves after water ceases to discharge and leave the Main Drain Valve F open Step 2 Replace the sprinklers that have operated and the sprinklers close to the fire Step 3 Push down on the reset knob P to allow the Dry Pipe Valve D to re seat Step 4 Via the Air Supply Control Valve K pressurize the system with air to 0 7 bar and then open and close each auxilia...

Page 38: ...rvice Step 1 Close the auxiliary drain valves after water ceases to discharge and leave the Main Drain Valve F open Step 2 Replace the sprinklers that have operated and the sprinklers close to the fire Step 3 Push down on the reset knob P to allow the Dry Pipe Valve D to re seat Step 4 Via the Air Supply Control Valve K pressurize the system with air to 0 7 bar and then open and close each auxilia...

Reviews: