12

Commissioning

6   Ensure that the application, in which the basin tap will be used, is appropriate for the 

   approved designation. The above information must be recorded and updated on every 
   occasion when any work is carried out on the basin tap.

Maintenance

To ensure the Sola thermostatic basin tap maintains a high level of protection, we advise the
following in service testing is conducted (the same equipment used to commission the basin tap
initially must be used in the following tasks).

    1   After a period of between 6 and 8 weeks from commissioning carry out the following;

        1.1  Record the temperature of the hot and cold water supplies.

        1.2  Record the temperature of the mixed water from the basin tap.

    2   If the mixed water temperature has changed significantly from the previous test results (e.g. 

        >1˚K), record the change and before resetting the mixed water temperature check that:

        2.1 All the strainers are clean.

        2.2 All the check valves are in good working order.

        2.3 The isolation valves are fully open.

    3   If the mixed water temperatures are acceptable, carry out the following:

        3.1  Record the temperature of the hot and cold water supplies.

        3.2 Record the temperature of the mixed water from the basin tap.

        3.3 Isolate the cold water supply to the mixing valve and monitor the mixed water 

            

temperature.

        3.4  Record the maximum temperature achieved as a result of (3.3) and the final 

            

temperature (the final temperature should not exceed the values quoted in table 2)

        3.6  Record the equipment used during these tests.

    4   If the mixed water temperature is greater than the values quoted in table 2 or the maximum 

        temperature exceeds the corresponding values from previous test results by more than 2˚K,
        the basin tap must be serviced.

    5   After a period of between 12 to 15 weeks from commissioning, carry out the sequence of 

        tests as described in Maintenance sections 1, 2, 3 and 4.

Summary of Contents for SF1139CP

Page 1: ...e We cannot accept any responsibility should it be found that in any respect the information is inaccurate or incomplete or becomes so as a result of further developments or otherwise Twyford Bathroom...

Page 2: ...ge Introduction and Safety 2 Components 3 Technical Data 4 Dimensions 4 Installation 5 Calibration 6 Cartridge Replacement 7 Aftercare and Spout Removal 7 TMV3 Section Introduction 8 Technical Specifi...

Page 3: ...re optimum performance levels of the product are obtained Safety Twyford thermostatic basin taps must be installed and commissioned correctly to ensure that water is supplied at a safe temperature to...

Page 4: ...Handle 8 2 Temperature stop ring 9 1 Thermostatic cartridge 10 1 Seat 11 1 Sealing ring 12 1 Horse shoe plate 13 1 Threaded rod 14 1 Retaining nut 15 2 350mm copper tail integral with body 16 2 Check...

Page 5: ...le for non modulating combination boilers Max Inlet Pressure Static 12 bar Max Unbalanced Pressure Ratio 15 1 Max Inlet Pressure Dynamic 5 bar with flow regulator Max Inlet Temperature 85 C Max Unbala...

Page 6: ...tube Screw the threaded rod 13 into the threaded hole in the base of the body taking care not to over tighten The cold supply must be connected to the right hand side and the hot to the left hand side...

Page 7: ...e cartridge Temporarily refit the handle 7 Using a digital thermometer increase or reduce the mixed water outlet temperature until 38 C is established and stabilised Remove the handle 7 and refit the...

Page 8: ...ubricate the O ring with a WRAS approved silicone based grease Re assemble in the reverse order Twyford taps have a high quality finish and should be treated with care An occasional wipe with a mild w...

Page 9: ...de these conditions cannot be guaranteed by the Scheme to operate as Type 3 valves Approvals TMV3 Scheme Approval Number Details Available on Request WRAS Scheme Approval Number Details Available on R...

Page 10: ...um temperature position vi Refit the handle in the reverse order Installation IMPORTANT The following instructions must be read prior to the installation of any Sola basin tap The installer should als...

Page 11: ...s are excessive it is possible to fit a pressure reducing valve or a flow regulator to reduce the pressure s to within the limits as quoted previously 8 Any thermostatic basin tap must be fitted with...

Page 12: ...e supply as the basin tap are opened during the setting of the mixed water temperature During commissioning it is advisable to ensure that the water temperatures are established before any attempt to...

Page 13: ...esetting the mixed water temperature check that 2 1 All the strainers are clean 2 2 All the check valves are in good working order 2 3 The isolation valves are fully open 3 If the mixed water temperat...

Page 14: ...th of these periods necessitating adjustment of the mixed water temperature then the next in service test can be deferred to 18 to 21 weeks after commissioning 6 4 If significant changes e g 2 K in th...

Page 15: ...ome nishes components such as lters seals O rings and washers Incorrect installation Repair using non Twyford parts Accidental or wilful misuse Corrosion and the use of inappropriate cleaning products...

Page 16: ...E O E 05 07 18 Twyford Lawton Road Alsager Stoke on Trent ST7 2DF UK UK Technical Helpline Telephone 01926 516800 or 01270 879777 Email technical geberit co uk Website www twyfordbathrooms com...

Reviews: