Preventative Maintenance
Hydraulic System Pressure Checks
At the time of each transmission oil change the main and lube pressure of the
transmission should be checked.
See Figures 3, 4, 5, and 6 in Operation for
pressure test point locations.
Prior to making pressure checks, ensure that the transmission is filled with oil
of the correct type.
Pressures should be measured with gages or instrumentation that
allows the technician to be at a safe distance from the fracturing rig
tires. Gages must be installed while the engine is not running. Pressure
checks are made with the engine running, the transmission in neutral,
and the fracturing rig parking brakes on. No one must be allowed in
front of, nor behind the fracturing rig nor near the fracturing rig tires.
Check main and lube system pressures as follows:
1.
Select desired check point and install 0-300 psi (0-2000 kPa) pressure
gauge to check main and clutch apply pressures, and 0-100 psi (0-800
kPa) pressure gauge for lube system.
2.
Start the engine, and shift to
Warm-Up
and bring the engine up to 1500
rpm. Allow the transmission oil to heat to 80° to 100° C.
3.
Refer to pressure requirements in Description and Specifications.
Summary of Contents for TA-90-8501
Page 3: ...Document Number 1020510 Revison 1 May 2002 Power Shift Transmission System Operator s Manual ...
Page 4: ......
Page 133: ......
Page 134: ......
Page 135: ......
Page 136: ......
Page 137: ......
Page 138: ......
Page 139: ......
Page 140: ......
Page 141: ......
Page 142: ......
Page 143: ......
Page 144: ......
Page 145: ......
Page 146: ......
Page 147: ......
Page 148: ......
Page 149: ......
Page 150: ......
Page 151: ......