Twin Busch GmbH
7
INSTALLATION INSTRUCTIONS
3.1 Preparations before installation
3.1.1 Tools and equipment needed
Appropriate lifting equipment
Anti-abrasion hydraulic oil.
Rotary Hammer Drill with 3/4’’ drill bit.
Chalk and tape measure, magnetic plump, 8 metersФ15 level pipe.
Sockets and open wrenches, a set of inside hex wrenches, cross and straight screw drivers.
Hammer, 4pounds,
sharp nose pliers,
Ф17,Ф19,Ф22 socket spanners
。
3.1.2 List for parts checking ---Annex 1
(
Packing list
)
Unfold the package and check if any parts are missed as per Annex 1. Do not hesitate to contact us in case any parts missing
3.1.3 Ground conditions
The lift should be fixed on a smooth and solid concrete ground with its strength more than 3000psi, tolerance of flatness less than
5mm and minimum thickness of 200mm.
3.2 Precautions for installation
3.2.1 Make sure the two posts stand paralleled and are vertical to the ground. No slanting.
3.2.2 Joints of oil hose and steel cable must be firmly connected in order to avoid the looseness of steel cable and leakage
of oil hose.
3.2.3 All bolts should be firmly screwed up.
3.2.4 Do not place any vehicle on the lift in the case of trial running.
3.3 Installation
To make it easiler for you clients we have prepared a video that shows you how to perform the installation step by step.
This can be found on our internet site or on youtube.
3.4 Items to be checked after installation
S/N
Check items
YES
NO
1
Are the posts vertical to the floor?
2
Are the two posts paralleled?
3
Are oil hoses well connected?
4
Are steel cables well connected?
5
Are all lifting arms well fixed?
6
Are electrical connections right?
7
Are the rest joints firmly screwed?
8
Are all items need lubricating added with grease?
Summary of Contents for 0741187302364
Page 2: ...Twin Busch GmbH 2 ...
Page 13: ...Twin Busch GmbH 13 Annex2 Overall diagram ...
Page 14: ...Twin Busch GmbH 14 Annex3 Floor plan ...
Page 16: ...Twin Busch GmbH 16 Annex5 Wiring diagram Single phase ...
Page 17: ...Twin Busch GmbH 17 Three phase ...
Page 18: ...Twin Busch GmbH 18 ...
Page 19: ...Twin Busch GmbH 19 ...
Page 20: ...Twin Busch GmbH 20 ...
Page 30: ...Twin Busch GmbH 30 ...
Page 31: ...Twin Busch GmbH 31 ...
Page 32: ...Twin Busch GmbH 32 ...
Page 33: ...Twin Busch GmbH 33 ...
Page 34: ...Twin Busch GmbH 34 ...
Page 35: ...Twin Busch GmbH 35 ...
Page 36: ...Twin Busch GmbH 36 ...