5 TEST RACK MANUFACTURING INSTRUCTIONS:

RX – – – – – – – – – – – – – – – – – the TX

3. Test rack for the whole machine: connect the computer and the tested machine

with the serial port to USB power supply line mentioned above

·

infrared lamp test:

The observation of infrared lamp in production is not obvious and the testing effi-

ciency is low. It is recommended that the finished product should be tested sepa-
rately for aging test.

Use a camera to take pictures and observe in a dark environment.

1. The router with the starting SSID of tuya_mdev_test1.

2. Power on the finished product.

3. When the module is swept to tuya_mdev_test1, it will automatically enter the

finished product production test mode. At this point refers to the red and blue
indicator light cycle flashing 6 times.

The infrared indicator continues to flash at intervals of 1 second.

4. Use the camera to take pictures and observe whether the four infrared lights

are flashing.

9 / 9

Summary of Contents for Voice IR

Page 1: ...Test guide for Voice IR Device Development Access Mode Product Solution Voice Products Domestic Voice Infrared SoC Solution Version 20200525 Online Version...

Page 2: ...ontents 1 Objective 2 2 The scope of 3 3 Solution platform installation 4 4 Solution platform operation instructions 5 5 Test rack manufacturing instructions 8 5 1 Production instructions for PCBA tes...

Page 3: ...Contents This product is only suitable for China 1 9...

Page 4: ...1 OBJECTIVE 1 Objective Infrared remote control function test operation instructions to facilitate customers to complete product testing 2 9...

Page 5: ...2 THE SCOPE OF 2 The scope of Voice infrared remote control products 3 9...

Page 6: ...ke the gra ti serial port board USB cable cut the USB head then connect the serial port board 5V GND TX RX with the USB cable pay attention to TX RX do not connect the reverse the welding is completed...

Page 7: ...le test series le to nd the corresponding path Figure 2 2 png Figure 3 3 png 2 Click start test and double click to establish the connection line Set the serial port the main serial port is set for th...

Page 8: ...run to power the device The remote control enters the production and test mode automatically Check the ashing indicator manually click ok the indicator does not ash and click failed Pass the test to t...

Page 9: ...the next step and test fail to stop the test For infrared transmission and reception test the distance between the two devices is suggested to be about 1m Test pass automatically takes the next step...

Page 10: ...n instructions for PCBA test rack Figure 6 6 png 1 It is suggested that the button should face up to facilitate employees to test the button 2 PCBA power supply serial port power supply to USB interfa...

Page 11: ...should be tested sepa rately for aging test Use a camera to take pictures and observe in a dark environment 1 The router with the starting SSID of tuya_mdev_test1 2 Power on the nished product 3 When...

Reviews: