SOLUTION PLATFORM OPERATION INSTRUCTIONS:

Figure 5:

5.png

Wifi performance test: the router with SSID of tuya_mdev_test1 needs to be set and

placed 3-5 meters away from the product under test. When the module receives
the router’s signal strength at -60db-10db, it is qualified. Test pass to automatically
modulate the next step, and test fail to stop the test.

For infrared transmission and reception test, the distance between the two devices
is suggested to be about 1m. Test pass automatically takes the next step, and test
fail stops.

Manual awakening test: manual awakening of “little wisdom butler” to equipment

Automatic wake test: play the voice file to automatically wake the device.

MIC and trumpet test: manual recording and broadcasting, manual speaking a word
casually, and loudspeaker playing a manual voice recording.

7 / 9

Summary of Contents for Voice IR

Page 1: ...Test guide for Voice IR Device Development Access Mode Product Solution Voice Products Domestic Voice Infrared SoC Solution Version 20200525 Online Version...

Page 2: ...ontents 1 Objective 2 2 The scope of 3 3 Solution platform installation 4 4 Solution platform operation instructions 5 5 Test rack manufacturing instructions 8 5 1 Production instructions for PCBA tes...

Page 3: ...Contents This product is only suitable for China 1 9...

Page 4: ...1 OBJECTIVE 1 Objective Infrared remote control function test operation instructions to facilitate customers to complete product testing 2 9...

Page 5: ...2 THE SCOPE OF 2 The scope of Voice infrared remote control products 3 9...

Page 6: ...ke the gra ti serial port board USB cable cut the USB head then connect the serial port board 5V GND TX RX with the USB cable pay attention to TX RX do not connect the reverse the welding is completed...

Page 7: ...le test series le to nd the corresponding path Figure 2 2 png Figure 3 3 png 2 Click start test and double click to establish the connection line Set the serial port the main serial port is set for th...

Page 8: ...run to power the device The remote control enters the production and test mode automatically Check the ashing indicator manually click ok the indicator does not ash and click failed Pass the test to t...

Page 9: ...the next step and test fail to stop the test For infrared transmission and reception test the distance between the two devices is suggested to be about 1m Test pass automatically takes the next step...

Page 10: ...n instructions for PCBA test rack Figure 6 6 png 1 It is suggested that the button should face up to facilitate employees to test the button 2 PCBA power supply serial port power supply to USB interfa...

Page 11: ...should be tested sepa rately for aging test Use a camera to take pictures and observe in a dark environment 1 The router with the starting SSID of tuya_mdev_test1 2 Power on the nished product 3 When...

Reviews: