Step2
1.
Locate the main pump column A and main column B on their positions.
2.
Anchor the main pump column A. If shimming is required,
insert the shims as necessary to
plumb the column.
3.
Locate the other two columns C and D on their positions.
4.
Insert the front and rear cross tubes E and F into the columns.
R
aise them up to
approximately 18" and place on safety locks
.
5.
Connect the balancing chain LH1234 inside the main column A and column C.
6.
Connect another balancing chain LH1234 inside the main column B and column C.
7.
Raise up the top cylinder beam G, put it on the main columns A and B. Use M12*50 bolts to
fix the beam
to
the columns.
8.
Pull out the piston of the main cylinder for 1750mm. Connect the two chains LH1246 to the
cross tubes.
9.
Check the positions of the unfixed 3 columns. Adjust the gaps between the tube and column.
Then anchor them.
U
se shims to plumb the columns.
10. Put the runways onto the cross tubes. Fix them by bolts.
Take care to place the rolling jack
rails toward the middle of the lift
.
11. Put on all the accessories such as front wheel stops and ramps.
12. Adjust all the chains enough to level the runways.
Step3
1.
Put the electro-hydraulic pump onto the main pump column.
2.
Connect all the pipes to pump and cylinders.
3.
Connect the wires for the pump motor.
4.
Connect the air pipe for the safety locks. (Pic.5)
5.
Fill up the pump tank with hydraulic oil for 2/3 capacity.
6.
Press the start button for first time raise. Check all the bolts, moving parts, etc.
7.
Run up and down several times to see if the lift is OK.
8.
Adjust the nuts on the chain ends to level the runways again.
9.
Adjust the height of the safety bar inside the column to
ensure crosstubes lock properly.