background image

 [4] 

1.

GETTING STARTED

This manual is written as a

 

guide for you to install, connect, and test the OBSG-

HG-CV optical speedgates.  You will learn how they work, how to operate them, which 
components are which, and what to  look  for  during  occasional  maintenance  and  repair 
visits.  We  ask  that  you  read  the entire manual before beginning the installation process.   

2.

OPERATIONAL OVERVIEW

The    OBSG-HG-CV  is  an  optical  speedgate  with  center  barriers  configured

 

for

continuous  bi-directional  cardholder  traffic  flow.    The    OBSG-HG-CV  standard 
configuration  is  set  at  card  in  /  card  out  for  secure  bi-directional  traffic  flow.    The  
OBSG-HG-CV can also be set to operate in several other modes that are set by the Remote 
Lane Controller, or through your access control system.   These modes include Free Exit, 
Free Entry, Exit Only, Enter Only, Disable Lane, and Close Lane. 

3.

MOUNTING AND INSTALLATION

Installing  speedgates  is  a  simple  process,  but  each  stage  requires  extra  care  to insure 
a smooth and problem free installation.  Here are a few pointers to keep in mind during 
installation: 

1. Beam alignment is critical.  The physical layout and securing of the speedgate

to the floor in the installation phase, should be carefully planned and laid out. The

floor must be level to allow for a secure mounting of the pedestal.  Extra care at
this  early  stage  will  ensure  a  smooth  and  problem  free  installation.    Improper
layout will affect beam alignment and cause the lanes to malfunction. Be sure the

pedestals are square and parallel in relationship to each other.  Always ensure the
proper lane width, and measure diagonally to be sure the pedestals are square.

2. Use gloves, if necessary.  In some cases the outer material of the cabinets can

be  very  sensitive  to  oils  (Unfinished  Brass  or  Muntz  Metal),  and  may  cause  a

permanent mark that will require replacement of the side/top panels.

3. Never place tools or metal objects on top of the turnstile.  Please be sure

not  to  leave  items  that  may  scratch  the  cabinet  leaning  against  the  side  of  the
pedestal.

www.TURNSTILES.us / www.entrapass.com / 8641 S. Warhawk Road, Conifer, CO 80433 / 303-670-1099

Summary of Contents for OBSG-HG

Page 1: ...1 Optical Barrier Swing Glass High Glass Clear View OBSG HG Installation Manual www TURNSTILES us www entrapass com 8641 S Warhawk Road Conifer CO 80433 303 670 1099...

Page 2: ...ry Side Electronics 7 C Lane Status Indicator LSI and Reader Mounting 8 5 WIRING 8 A Single Lane 8 B Multiple Lanes 9 C Standard Power Supply 9 D PIO to SIO Communications 10 E Motor to Motor Communic...

Page 3: ...ERS RLC optional 13 A Push Button Controller RCL PB 13 B Remote Screen Controller RLC TS or Infinity RLC SW 14 16 7 SENSOR ALIGNMENT GUIDE www TURNSTILES us www entrapass com 8641 S Warhawk Road Conif...

Page 4: ...to insure a smooth and problem free installation Here are a few pointers to keep in mind during installation 1 Beam alignment is critical The physical layout and securing of the speedgate to the floo...

Page 5: ...referenced from the unsecured side of the building Pedestal 1 will always be the turnstile farthest to the right Pedestal 2 will be just to the left of Pedestal 1 and so forth These pedestal numbers...

Page 6: ...n the primary side of the lane Alarm Speaker One speaker is mounted above the PIO and produces the sound for each lane Mini Master Motor Controller The mini master is used as a language translator bet...

Page 7: ...well as saves all of the settings for each lane Chopper Board Resistor This board is in line with the direct motor power It is used to direct any generated power from the movement of the arms into th...

Page 8: ...alled in the field at a later date If a non standard proximity card reader is used 5 WIRING A Single Lane One OBSG HG CV speedgate consists of two pedestals Each lane will contain one 1 Primary I O Bo...

Page 9: ...ly 120Vac 24Vdc 10A Power Supply Verify output power is between 24 25VDC on two pin connector J11 before connecting it to PIO The Life Safety power supply provided with the units is capable of handlin...

Page 10: ...rom each lane s primary pedestal PIO to the corresponding lane s secondary pedestal SIO 24vdc Input for the PIO Board Connector J11 Connect pins 1 4 from J12 on the PIO board to J1 on the SIO Board PI...

Page 11: ...wered the green LED on the motors should be solid if it is blinking the communications cable is not seated properly F Access Control FACP Inputs An 18awg 6 conductor is required to run to each lane s...

Page 12: ...t simply provide a jumper from that point to ground 22 14 from RLC PB to PIO Board Connector J16 Listed From bottom to top Point Description 16 Visitor Enter 15 Visitor Exit 14 Reset Lane 13 Optical M...

Page 13: ...uter a separate cable should be run from the DHCP device to the control computer IPs will need to be saved to each PIO and then set in the computer J Earth Ground An earth ground is required to each p...

Page 14: ...on our standard touchscreen computer RLC TS or our Surface Pro bundle RLC SP The Main Control Screen is customizable for viewing all the lanes in your suite at one time It provides visitor entry exit...

Page 15: ...eir position The lane will be down for 25 seconds during this calibration 5 Disable This lane can be shut down allowing for free access in both directions The feature may be used for large visitor par...

Page 16: ...r vertically should be done by loosening one of the screws that mount the sensor to the sensor bracket adjusting and then tightening in place 5 During adjustments look for the orange LED on top of the...

Reviews: