PN 106169
Rev B
E09 TD-4100XD Oil In Water Monitor
Clean-In-Place Addendum
A-1
ADDENDUM: CLEAN-IN-PLACE SYSTEM
This addendum provides the appropriate general arrangement drawings, installation specifics, and
operating instructions for an E09 TD-4100XD monitor equipped with an integrated clean-in-place (CIP)
system. The functionality and general operational instructions for your monitor remain as described in
the manual, with the exceptions described in this addendum.
In some cases the arrangement and appearance of your CIP-equipped monitor do not match the
graphic images shown in the manual. If you have questions regarding installation, connections, settings,
procedures, or the general appearance of your monitor, contact a service representative at Turner
Designs Hydrocarbon Instruments:
Tel: + 1 559 253 1414, Fax: + 1 559 253 1090, or
Email:
A.1 INSTALLING THE CLEAN-IN-PLACE SYSTEM
The following installation steps include references to
Figure A.1.1
.
1. Install the valve and pipe combo (1) into
the sample pump discharge port as shown.
Remove the flexible hose if required.
2. Install the CIP return port (2) as shown.
Make sure that the union half axis is parallel
to the sample pump discharge port axis.
3. If not yet installed, install the CIP return
port (3) into the 3/4”
FNPT tank fitting. This
section shall be vertical to the ground. For
best results, install prior to the CIP main
body.