![Turin TU-SB-979-48-36-R Installation And Owner'S Manual Download Page 72](http://html.mh-extra.com/html/turin/tu-sb-979-48-36-r/tu-sb-979-48-36-r_installation-and-owners-manual_1181938072.webp)
Mark the Top Rail Location
ATTENTION:
A minimum of two people are required for the next assembly steps.
Pre-assembly the top rail (2) onto the fixed glass (3) to locate the mounting points on
the wall to your desired location.
Painters tape or masking tape in the general location of the of the final installation will
aid in marking the wall and floor.
12
2
%
�6-
%
ti
oat----c-�
1�-
%
--
4-2
--f)@
5
--
7
�
ltiO
fl
CD�
Summary of Contents for TU-SB-979-48-36-R
Page 23: ...Installing the door seals Install the door seals according to the drawing 22 ...
Page 50: ...Installation des joints de porte Installez les joints de porte conformément au dessin 2 ...
Page 59: ......
Page 82: ...Installing the door seals Install the door seals according to the drawing 22 ...
Page 109: ...Installation des joints de porte Installez les joints de porte conformément au dessin 2 ...
Page 118: ......