Sliding Door Installation
1. Measure the width of the shower opening at the top between the fixed glass and
the wall. Note this is dimension "X".
y
2. The following equation is used to determine the length to be cut from the rail in
order to fit the shower opening.
y = X-%"
3. Measure distance "Y" from the end of Top Rail (2) with pre-assembled hardware
mark the top rail.
NOTE: Do not cut the end of top rail with pre-assembled hardware. Only cut the
end of top rail opposite the pre-assembled hardware.
4. Using a hacksaw or jigsaw cut the Top Rail (2) at the mark. Carefully remove
any burrs or sharp edges remaining on Top Rail (2) after the cutting.
11
Summary of Contents for TU-SB-979-48-36-R
Page 23: ...Installing the door seals Install the door seals according to the drawing 22 ...
Page 50: ...Installation des joints de porte Installez les joints de porte conformément au dessin 2 ...
Page 59: ......
Page 82: ...Installing the door seals Install the door seals according to the drawing 22 ...
Page 109: ...Installation des joints de porte Installez les joints de porte conformément au dessin 2 ...