Operation Instructions
6.4
Operation
■
If the device is used in low demand mode, proof tests shall be executed periodically accord-
ing to T1 (see
„Appendix: Proof Test“ on page 22
).
■
Ensure that the plug connections and cables are always in good condition.
■
The device must be replaced immediately if the terminals are faulty or the device has any vis-
ible faults.
■
If cleaning is required, do not use any liquid or statically charging cleaning agent. Perform
proof tests after each cleaning (see
„Appendix: Proof Test“ on page 22
).
■
The device must be replaced before remaining longer than 24 h within the safe state due to
an internal failure
■
The proof test (see
„Appendix: Proof Test“ on page 22
) shall be executed each time after
installation and parameterization in order to check the requested function.
■
The DIP switches shall not be modified during operation. The device shall be locked against
unintended operation/modification.
Fig. 6: Output relay load curve
The connection of a deactivated input is unnecessary.