STEP 3: INSTALL THE INLET GAS PIPE
STEP 4: STACK THE OVENS
4.5
Remove the maneuvering casters from the back of the oven.
4.6
Immediately discard the maneuvering casters. These casters
are not designed to be used again.
4.7
Replace the maneuvering casters with the supplied bolts
(refer to page 2) and ensure that all the holes in the rear of
the oven are plugged.
WARNING:
When installing any gas pipes and/or making connections, observe
all local gas and building codes (refer to the regulations in force in the country in
which the appliance is being installed). Use the proper thread-sealing compound
when installing gas pipes. DO NOT use Te
fl
on
®
tape as thread sealant.
3.1
Remove the oven’s back panel and install the 10” (254mm) gas pipe inlet (refer to
page 2) as shown adjacent. The 10” (254mm) gas pipe inlet is only used on a
single or bottom oven.
NOTE:
If installing a single oven, proceed to
STEP
5, page 7.
4.1
If installing a double or triple stacked oven, remove the gas pipe plug in the top of
the base oven and repeat STEPS 1.1-2.6 (skip step 2.2), pages 3 and 4 for the
middle
oven.
4.2
Position the base oven beneath the raised oven.
4.3
Lock the casters of the base oven.
4.4
Lower the raised oven onto the base oven.
4.8
Install the stacking brackets (refer to page 2) to the two ovens as shown adjacent.
Both stacking brackets MUST be attached to the ovens.
Step 3.1
Step 4.1
Step 4.5
Step 4.8
Stacking Brackets
Summary of Contents for HHC-3240
Page 2: ......
Page 3: ...For further information call 800 90TURBO or 1 214 379 6000 ...
Page 20: ......
Page 21: ......