background image

 

24 

 

 

 

5.3. Curve page - Solar, Load and Grid 

 

Solar power curve for daily, monthly, yearly and total can be roughly checked 
on the LCD, for more accuracy power generation, pls check on the monitoring 
system. Click the up and down arrow to check power curve of different period.

 

 

Summary of Contents for Hybrid 48V Series

Page 1: ...https www turbo e com Instruction manual Three phase Hybrid Series 48V 10 0...

Page 2: ...battery 11 3 5 Function port definition 12 3 6 Grid connection and backup load connection 13 3 7 PV connection 14 3 7 1 PV module selection 14 3 7 2 PV Module wire connection 15 3 8 CT connection 17 3...

Page 3: ...etup Menu 26 5 7 System Work Mode Setup Menu 27 5 8 Grid Setup Menu 28 5 9 GEN PORT USE Setup Menu 29 5 10 Advanced Function Setup Menu 29 5 11 Device Info Setup Menu 30 6 MODES 30 7 LIMITATION OF LIA...

Page 4: ...ry important to correctly operate this inverter Please strictly follow installation procedure when you want to disconnect AC or DC terminals Please refer to Installation section of this manual for the...

Page 5: ...rs 2 LCD display 3 Function buttons 4 Power ON OFF button 5 DC switch 6 Parallel port 7 Meter 485 port 8 Battery input connectors 9 Function port 10 ModeBUS port 11 BMS port 12 PV input 2 MPPTs 13 Gri...

Page 6: ...rent voltage based on applications by LCD setting Configurable AC solar generator charger priority by LCD setting Compatible with grid voltage or generator power Overload over temperature short circui...

Page 7: ...7 Time of use function Smart load function 3 INSTALLATION 3 1 Component list...

Page 8: ...ls are stored Not in potential explosive areas Not to expose directly to cold airflow Not near the television antenna or antenna cable Not higher than altitude of about 2000 meters above sea level Not...

Page 9: ...inverter at eye level in order to allow the LCD display to be read at all times The ambient temperature should be between 25 C and 60 C to ensure optimal operation Be sure to keep other objects and s...

Page 10: ...r or disconnect device is required between the battery and the inverter In some applications switching devices may not be required but over current protectors are still required Refer to the typical a...

Page 11: ...11 3 Make sure polarity at both the battery and inverter is correctly connected 3 4 Temperature sensor connection for lead acid battery...

Page 12: ...12 3 5 Function port definition...

Page 13: ...blocks with Grid Load and GEN markings Please do not misconnect input and output connectors Model Cable size Cable mm 2 Torque value max 10kW 11AWG 4 1 2Nm Please follow below steps to implement Grid...

Page 14: ...d cut off output to protect your appliance but sometimes it still causes internal damage to the air conditioner 3 7 PV connection Before connecting to PV modules please install a separately DC circuit...

Page 15: ...ut connector to the inverter Cable type Cross section mm2 Range Recommended value Industry generic PV cable model PV1 F 4 0 6 0 12 10AWG 4 0 12AWG The steps to assemble the DC connectors are listed as...

Page 16: ...c Insert the contact pin to the top part of the connector and screw up the cap nut to the top part of the connector d Finally insert the DC connector into the positive and negative input of the invert...

Page 17: ...17 3 8 CT connection...

Page 18: ...connected to ground plate on grid side This prevents electric shock if the original protective conductor fails 3 10 Wi Fi connection For the configuration of Wi Fi Plug please refer to illustrations...

Page 19: ...19 3 12 Connection diagram...

Page 20: ...battery system can still work 4 2 Operation and display panel The operation and display panel shown below is located on the front panel of the inverter It includes four indicators four function keys...

Page 21: ...At the top of the screen is the time 3 Pressing System Setup Icon it is possible to enter in the system setup screen which includes Basic Setup Battery Setup Grid Setup System Work Mode Generator port...

Page 22: ...22 5 1 1 LCD operation flow chart...

Page 23: ...23 5 2 Information from Main Menu...

Page 24: ...Grid Solar power curve for daily monthly yearly and total can be roughly checked on the LCD for more accuracy power generation pls check on the monitoring system Click the up and down arrow to check...

Page 25: ...25 5 4 System Setup Menu 5 5 Basic Setup Menu...

Page 26: ...26 5 6 Battery Setup Menu...

Page 27: ...t Sol BU Back Up Mode Battery is not discharged to cover demand CH Charge Mode Battery charge mode Enable Habilita el sistema de trabajo por periodos horarios GPS Grid Peak Shaving Establece el l mite...

Page 28: ...28 5 8 Grid Setup Menu...

Page 29: ...29 5 9 GEN PORT USE Setup Menu 5 10 Advanced Function Setup Menu...

Page 30: ...30 5 11 Device Info Setup Menu 6 MODES Mode I Basic...

Page 31: ...31 Mode II With wind turbine Mode III With generator Mode IV With smart load...

Page 32: ...le 7 LIMITATION OF LIABILITY The manufacturer is not responsible for the possible loss of profit or economic losses incurred by product failures covered by the scope of the product warranty 8 DATASHEE...

Page 33: ...rent Harmonic Distortion THD 3 Linear load 1 5 Efficiency Max Efficiency 97 60 Euro Efficiency 97 00 MPPT Efficiency 99 90 Protections PV Arc Fault Detection Integrated PV Input Lightning Protection I...

Page 34: ...34 Communication with BMS RS485 CAN Weight kg 36 8 kg Size Height x Width x Depth mm 658 x 422 x 281 mm Protection Degree IP65 Installation Style Wall mounted Warranty 5 years...

Page 35: ...35 9 APPENDIX CT dimensions mm Secondary output cable length is 4m...

Reviews: