13
3.6. Grid connection and backup load connection
-
Before connecting to grid, please install a separate AC breaker
between inverter and AC input power source. This will ensure the
inverter can be securely disconnected during maintenance and
fully protected from over current. The recommended AC
breaker is 25A.
-
There are three terminal blocks with “Grid”
“Load”
and “GEN”
markings. Please do not misconnect input and output
connectors.
Model
Cable size
Cable (mm
2
)
Torque value (max)
10kW
11AWG
4
1.2Nm
Please follow below steps to implement Grid, Load and Gen port
connection:
1.
Before making Grid, Load and Gen port connection, be sure to
turn off AC breaker or disconnector first.
2.
Remove insulation sleeve 10mm length, unscrew the bolts,
insert the wires according to polarities indicated on the terminal
block and tighten the terminal screws. Make sure the
connection is complete.
Summary of Contents for Hybrid 48V Series
Page 1: ...https www turbo e com Instruction manual Three phase Hybrid Series 48V 10 0...
Page 7: ...7 Time of use function Smart load function 3 INSTALLATION 3 1 Component list...
Page 12: ...12 3 5 Function port definition...
Page 17: ...17 3 8 CT connection...
Page 19: ...19 3 12 Connection diagram...
Page 22: ...22 5 1 1 LCD operation flow chart...
Page 23: ...23 5 2 Information from Main Menu...
Page 25: ...25 5 4 System Setup Menu 5 5 Basic Setup Menu...
Page 26: ...26 5 6 Battery Setup Menu...
Page 28: ...28 5 8 Grid Setup Menu...
Page 29: ...29 5 9 GEN PORT USE Setup Menu 5 10 Advanced Function Setup Menu...
Page 30: ...30 5 11 Device Info Setup Menu 6 MODES Mode I Basic...
Page 31: ...31 Mode II With wind turbine Mode III With generator Mode IV With smart load...
Page 35: ...35 9 APPENDIX CT dimensions mm Secondary output cable length is 4m...