2.4.4 Any cables or wires of the system, which might be damaged due to outdoor
exposure, should be coated with conduit for protection.
3. Precautions:
Operators must clearly know safety measurement. Safety relies on our joint efforts.
3.1 All operations must:
a. Follow instructions in the manual.
b. Operated by specialized workers.
c. Accident or injury or possible severe damage to equipment may result if false
operation.
3.2 Operation workers must master:
a. Equipment recognition.
b. Correct equipment operation ability.
c. Relevant safety knowledge.