INSTALLATION GUIDE 920.1037.03 |
12
STEP 04
- FITTING THE MANUAL OVERRIDE LEVER MECHANISM
Drill two 1/4” holes in the door track or frame in a position at least
2” higher than the fully extended position of the Outer Cable
Bracket to allow flexibility of movement for the Bowden cable. Use
the supplied M5 screws and flange nuts to secure the Outer Cable
Bracket to the door track or frame.
(Pic 8).
Hang the Manual Override Lever hook on the end of the inner cable
with the lever in the upright position. Mark the mounting hole
positions for the lever on the door track or frame – the supplied
chain may be needed to position the lever within 6 feet of the floor.
Drill two 1/4” holes and secure the lever using the M5 screws and
flange nuts supplied.
(Pic 9).
PIC 9
PIC 8
M5 screws
M5 screws
MO
U
N
TI
N
G
H
O
LE
MO
U
N
TI
N
G
H
O
LE
OVERRIDE
LEVER
Summary of Contents for ZAP THE BUTLER
Page 1: ...920 1037 02 ...