
Step 22
– Install a 475KΩ resistor between turret T32 and T33. Solder at T32.
Step 23
– Install a .047μfd capacitor (brown cap, code “F473K”)
between turrets T34 and T35. Solder at T34.
Step 24
– Install a 100KΩ resistor between turrets T35 and T36.
Solder at T36.
Step 25
– Trim in half the leads of the three .022μfd capacitors
(brown cap, code “F223K”).
Step 26
– Insert these three .022μfd capacitors all together.
Install the first .022μfd capacitor between turrets T29 and T31.
Install the second cap between turrets T31 and T33. Install the
final capacitor between turrets T33 and T35 (photo 6.9d).
Step 27
– Slowly press them into the turrets and rotate them
slightly until they are nearly flush with the turrets (photo 6.9e).
Step 28
– Remove these three caps from the turrets and trim the
leads to where only 1/8” of the lead of each cap fits into the
turret. Reinstall the three capacitors and solder into place.
Step 29
– Install an 8.25KΩ resistor between turrets T37 and
T38. Solder at T37.
Step 30
– Install a .01μfd Mallory capacitor between turrets T39
and T40. Save the trimmed leads from this component.
Step 31
– With one of the salvaged leads from above, install this
salvaged lead between turrets T38 and T40. Solder at T40.
Step 32
– Install a 475KΩ resistor between turrets T38 and T42.
Solder at T38.
Step 33
– Install a 475KΩ resistor between turrets T42 and T48.
Solder at T42.
Step 34
– Install an 8.25KΩ resistor between turrets T45 and
T48. Solder at T45.
Step 35
– Install the remaining salvaged lead between turrets
T46 and T48. Solder at T48.
Step 36
– Install a .01μfd Mallory capacitor between turrets T43
and T46. Solder at T46.
Step 37
– Install a 100KΩ resistor between turrets T39 and T41.
Step 38
– Install a 100KΩ resistor between turrets T41 and T43. Solder at T41.
Step 39
– Install a 47pfd silver mica capacitor between T39 and T43. Solder at both turrets.
Step 40
– Install a small bead of silicon sealant (just a dab with do) to the board directly
between turrets T47 and T50 (photo 6.9f). This will help to hold the component firmly to the
board and reduce potential buzzing.
Step 41
– Install a 22μfd/500V electrolytic cap between turrets T47 and T50 directly on top of
the silicon sealant. Make sure the positive lead of this component is connected to turret T47.
Solder in place (photo 6.9g / h).
Step 42
– Install a 8.2KΩ/2W metal oxide resistor between turrets T49 and T52. Solder at
T49 (photo 6.9h).
Step 43
– Install a 1KΩ/2W metal oxide resistor between turrets T51 and T52.
Step 44
– Install a 1KΩ/2W metal oxide resistor between turrets T53 and T54. Solder these
two metal oxide resistors in place at all four turrets (T51 – T54) (photo 6.9h).
Step 45
– Install a 150Ω/10W wire wound resistor between turrets T55 and T56. Solder at
TubeDepot.com 37
photo 6.9f
photo 6.9g
photo 6.9h