Beijing TT Aviation Technology Co., Ltd.
Add: No.1 TTA Building, Niantou Industrial Park ,Changping District,Beijing, China
www.ttaviation.org
50
5.9.2 Start Spraying
(1) After adjusting route completely, press [Start] to enter into spraying process.
(2) The spraying parameters can be adjusted in the spraying interface,such as spray type,
flying speed, Radar etc.
Auto Pwm
- spraying volume per area unit
CT
- U type turn (coordinated turn)
(3) Press [Confirm] and the route will be uploaded by itself.