- 24 -
once
once
once
once
Long press
wait
wait
Figure 5.15 Single-phase meter address setting
①
Power on the meter to the display interface and long press
button to enter meter switching
interface, select
and wait for 2s to enter meter address interface automatically.
②
After entering the address interface, please press
to set meter address according to the system
type into 1 or 2.
③
After the address set, the interface will jump to the initial display interface and there is no further
operation is required to start the meter.
(6) After settings, users can move to set the Zero Injection on the hybrid inverter.
Figure 5.16 Zero injection setting
Note: Meter is not waterproof or dust-proof, it is recommended to install it in the distribution box. If the
current value showed in the meter is a negative value, the zero injection is working.
5.8 Ground Connection
Ground of the inverter. After penetrating the external hex head screw through OT terminal of the grounding
line, screw in the grounding port of enclosure of the inverter in clockwise direction and make sure it is
screwed up tightly.