background image

 

 

I Version 

applies to the wiring rules that require Neutral line of

 

alternative supply 

must NOT be isolated or switched (applies to wiring rules AS/NZS_3000:2012 for 

Australia and New  Zealand). 

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Meter 

Summary of Contents for TSOL-A3.0K-H

Page 1: ...TSOL A3 0K H TSOL A3 6K H TSOL A4 0K H TSOL A4 6K H TSOL A5 0K H TSOL A6 0K H...

Page 2: ......

Page 3: ...sion O I 16 4 5 General Data 17 5 Installation 18 5 1 Check for Physical Damage 18 5 2 Packing 18 5 3 Installation Precaution 19 5 4 Space Requirement 20 5 5 Installation steps 20 6 Electrical Connect...

Page 4: ...8 2 Routine maintenance 45 9 Decommissioning 46 9 1 Remove the Inverter 46 9 2 Packaging 46 9 3 Storage and Transportation 46 10 Warranty Card 47...

Page 5: ...sion without EPS function 1 2 Target Group This manual is for qualified electricians The tasks described in this manual only can be performed by qualified personnel 1 3 Symbols Used The following type...

Page 6: ...pting any maintenance or cleaning or working on any circuits connected to inverter Caution Possible damage to health as a result of the effects of radiation Do not stay closer than 20 cm to inverter f...

Page 7: ...scharge Measure the voltage between terminals UDC and UDC with a multi meter impedance at least 1Mohm to ensure that the device is discharged before beginning work 35VDC inside the device Lightning wi...

Page 8: ...No protection settings can be altered User shall ensure that equipment is so installed designed and operated to maintain at all times compliance with the requirements of ESQCR22 1 a For Australia and...

Page 9: ...come hot during operation Avoid contact during operation Danger of high voltages Danger to life due to high voltages in the inverter Danger Risk of electric shock Observe enclosed documentation The in...

Page 10: ...30 EU The unit is based on EN 62109 1 2010 EN 62109 2 2011 IEC 62109 1 ed 1 IEC62109 2 ed 1 EN 61000 6 3 2007 A 2011 EN 61000 6 1 2007 EN61000 6 2 2005 The grid connected inverter leave the factory co...

Page 11: ...e depends on the battery and user s preference It can provide power for emergency use during the grid lost by using the energy from battery System Diagram TSOL Series is designed with two EPS versions...

Page 12: ...STEM FOR O Version L N PE Battery Backup Load On Grid Load Grid DC Breaker Changeover Device DPDT AC Breaker PE Bar AC Breaker Fuse Fuse AC Breaker Fuse To Meter To Battery Home Electric Meter Single...

Page 13: ...9 I Version applies to the wiring rules that require Neutral line of alternative supply must NOT be isolated or switched applies to wiring rules AS NZS_3000 2012 for Australia and New Zealand Meter...

Page 14: ...10 WIRING SYSTEM FOR I Version L N PE Battery Backup Load On Grid Load Single Phase Meter Grid DC Breaker AC Breaker AC Breaker PE Bar N Bar AC Breaker To Meter To Battery Home Electric Meter...

Page 15: ...en to charge the battery The redundant power will export to the public grid In the absence of the external generator or the power is not enough battery will discharge for local loads firstly and grid...

Page 16: ...will charge the battery In the absence of the external generator or the power is not enough battery will discharge for local loads firstly and grid will supply power when the battery capacity and pow...

Page 17: ...according to the set power within the set charging time During the set discharge time the battery is discharged according to the set power Other time according to Self Use mode EPS Status When the gr...

Page 18: ...ter Object Description A Battery connection area B Waterproof valve C EPS output D GRID output E BMS Meter F DI DO G WiFi RF port for external Pocket WiFi RF Warning Qualified electrician will be requ...

Page 19: ...ed grid voltage range V 220 230 240 180 to 270 Rated grid frequency Hz 50 60 Nominal AC current A O U Version 13 16 17 3 20 21 7 26 1 Max AC current A O U Version 14 16 18 6 21 4 23 2 27 9 Nominal AC...

Page 20: ...nitoring YES Residual current detection YES Anti islanding protection YES Over load protection YES Over heat protection YES 4 4 EPS output apply toversion O I Model TSOL A3 0K H TSOL A3 6K H TSOL A4 0...

Page 21: ...all mounted Operating temperature range 20 60 Derating at 45 Storage temperature 20 60 Storage Operation relative humidity 0 95 non condensing Altitude m 2000 Ingress Protection IP65 for outdoor use P...

Page 22: ...ription A Inverter B Bracket C 4 Expansion tubes 4 Expansion screws D Battery connectors 1 positive 1 negative E 4 Cord end terminals 6AWG and 5 Cord end terminals 10AWG for Version I 9 Cord end termi...

Page 23: ...enna cable Not higher than altitude of about 2000m above sea level Not in environment of precipitation or humidity 95 Under good ventilation condition The ambient temperature in the range of 20 to 60...

Page 24: ...h driller make sure the holes are deep enough at least 40mm to support the inverter 1 3 Install the expansion tubes in the holes and tighten them Then install the wall bracket with the expansion screw...

Page 25: ...21 Step1 Step2 Step3 Fasten the inverter on the back board with screws M5 12 the same as the other side Recommended installation of anti theft lock user owned...

Page 26: ...l the phases and secure against re connection Step2 Remove the top down cover from the inverter Step3 Make AC wires 3 1 Choose the appropriate wire Cable size refer to Table 4 3 2 Reserve about 60mm o...

Page 27: ...e with earth terminal a screw it on the grounding stud 6 2 EPS Connection apply to O Version and I Version only TSOL series inverter has On and Off grid function the inverter will deliver output power...

Page 28: ...rules which require Neutral line of alternative supply must not be isolated or switched applies to wiring rules AS NZS3000 2014 of Australia and New Zealand Auto Manual EPS function can be achieved a...

Page 29: ...and the operation guide above especially for the wiring of neutral line grounding and RCD please contact us before any operation O Version O Version EPS breaker Please contact our sales for any compa...

Page 30: ...5 Compress the AC terminal head by using a crimping pliers and screw down screw cap tightly Step2 Insert EPS cable into EPS port through screwcap and then tighten the screw cap Insert L wire N wire a...

Page 31: ...ing is within EPS output rating otherwise the inverter will shut down with an over load warning When an over load is appeared adjust the load power to make sure it is within the EPS output power range...

Page 32: ...compatible with TSOL inverter Battery breaker Before connecting to battery please install a non polarized DC breaker to make sure inverter can be securely disconnected during maintenance Battery conne...

Page 33: ...ripped cable up to the stop negative cable for DC plug and positive cable for DC socket are live Hold the housing on the screw connection Step3 Press down spring until it clicks audibly into place it...

Page 34: ...cable through the cable nut Step3 Assemble the cable gland and screw the cable nut Step4 Insert one RJ45 side of the cable into BMS port inside of inverter and the other side into CAN port of the bat...

Page 35: ...Step1 Disassemble the BMS Meter cable gland Step2 Prepare two communication cables without sheath and insert the communication cables through the cable nut Step3 Assemble the cable gland and screw th...

Page 36: ...control signals as below Note pin definitions as below DRM Connection Steps Please refer to BMS connection steps for RJ45 connection Please kindly note the PIN definition and port position will be sl...

Page 37: ...lmost empty DO 4 5 Connect the battery temperature sensor for lead acid batteries only When the battery temperature exceeds the allowable range battery charge and discharge will be prohibited 6 7 RS48...

Page 38: ...esignated load via an external Smart Plug purchase the product from supplier if needed so that the load mostly consumes energy and incurs the lowest possible energy costs during operation 6 9 Inverter...

Page 39: ...LCD screen if it is the first time to start up please follow it For specific setting please refer to section 8 Setting Step3 Set WiFi according to WiFi user manual Step4 Operate Self Test applies to I...

Page 40: ...he inverter will consecutively check the protection reaction times and values for over voltage under voltage over frequency and under frequency Self test function is available at any time and the test...

Page 41: ...ash in green The inverter is in wait status Off The inverter is in fault status C lit in red The inverter is in fault status Off The inverter has no errors D Function Button Esc button Return from cur...

Page 42: ...Work Mode Bat Para Export Limit Reset Italy Auto Test Safety Yield Reset EPS Status Event List Factory Default Note All advanced settings can only be set by technicians or installers with installer p...

Page 43: ...on working condition and it is inverter default status Off means the inverter stop delivering all power but the LCD remains on 7 3 6 About The about function contains five items data of the inverter T...

Page 44: ...ower is feeding to the grid supplying the load charging the battery This work mode applies to the area with high feed in tariff Peak Valley Mode Charge the battery according to the set power within th...

Page 45: ...attery capacity AH constant charge voltage max soc only for lithium charge cut off voltage only for lead crystal min soc only for lithium discharge cut off voltage only for lead crystal Note Current s...

Page 46: ...tatus Disconnect battery reconnect it Or seek help from us if can not go back to normal state Grid Lost Fault Grid is Lost Please wait for a while and system will reconnect if the utility is back to n...

Page 47: ...Over Fault Temperature over the limitation Check if the environment temperature is over limitation Or seek help from us Bat ConDir Fault Battery Reverse Connection Fault Check if the positive pole an...

Page 48: ...t grid and battery reconnect them Or seek help from us if can not go back to normal state Mgr EEPROM Fault Manager EEPROM Fault Disconnect grid and battery reconnect them Or seek help from us if can n...

Page 49: ...not functioning properly or fails any of test the device has to be repaired For safety check details refer to this manual section 2 Safety instruction and EC Directives Maintain Periodically Only qua...

Page 50: ...eets the following requirements 1 Suitable for load weight more than 30kg 2 With handle 3 Can be fully closed 9 3 Storage and Transportation Store the inverter in a dry environment where ambient tempe...

Page 51: ...ed Date of Bill of Lading No of Fault Products Series No of Fault Products Fault Time Fault Messages Brief Fault Description and Photos Installation Information Modules Used Modules Per String No of S...

Page 52: ......

Page 53: ......

Page 54: ......

Reviews: