User Manual B410PT
12
13
3.3 Installing the motherboard Board
Before you perform this procedure, read the safety instructions of this manue
l
See safety instructions in Port Townsend Board Information document.
Remove the two copper standoffs(09-1057-01A)
as shown.
Remove the blade from the chassis (see section
3.1) then, remove the front and rear top covers
(see section 3.2)
1
2
4
3
Aligh the Port Townsend board to the mounting
location, carefully place the system board into the
chassis and ensure the board I/O insert into the
I/O gasket cutout
Tighten and secure the board with the round head
#6-32 screw(09-1003-01A) from accessories box.
Install the Front Panel cable, Power Supply cable,
and other device connectors to the system board.
(Refer to your Port Townsend board information
document for futher instruction)
4
6
Install the air recirculation block off form as
shwon
7
Figure 20 Installing the Port Townsend board
2
Figure 19 Removing the copper standoffs
Figure 21 Secure the board by tighten mounting screws
Tighten also the two copper standoffs as shown
5
5
Close the top cover and install the blade back to
the chassis ( see section 3.1 and 3.2)
8
7