![TSI Incorporated 8587A Operation And Service Manual Download Page 21](http://html1.mh-extra.com/html/tsi-incorporated/8587a/8587a_operation-and-service-manual_1178069021.webp)
Unpacking and Setting Up the Laser Photometer
2-3
C o n n e c t i n g t h e S a m p l e L i n e s
Upstream and Downstream sample lines must be connected at the back of
each Laser Photometer. Tube stubs for tubing connections are labeled
accordingly; UPSTREAM and DOWNSTREAM. Clear ID 4.8 mm (
3
16
in.)
vinyl tubing is recommended for the sample lines. The tubing must be
pushed completely over each tube stub. A touch of silicone grease applied
to the outside of the tube stub will simplify the connection.
Summary of Contents for 8587A
Page 1: ...LASER PHOTOMETER MODEL 8587A OPERATION AND SERVICE MANUAL P N 1980538 REVISION D JULY 2015 ...
Page 2: ......
Page 10: ...x Model 8587A Laser Photometer This page intentionally left blank ...
Page 16: ...xvi Model 8587A Laser Photometer This page intentionally left blank ...
Page 22: ...2 4 Model 8587A Laser Photometer This page intentionally left blank ...
Page 34: ...3 12 Model 8587A Laser Photometer Figure 3 4 Sheath Air Flow System ...
Page 46: ...4 8 Model 8587A Laser Photometer This page intentionally left blank ...
Page 52: ...5 6 Model 8587A Laser Photometer This page intentionally left blank ...
Page 68: ...B 14 Model 8587A Laser Photometer This page intentionally left blank ...
Page 80: ...C 12 Model 8587A Laser Photometer This page intentionally left blank ...
Page 84: ......