© Trynex International 2009 L1185
5— 26
Operating the Spreader
PREPARATION
CAUTION –
Sweep area clear of foreign objects or obstacles that could cause personal injury. Keep other persons, children,
or animals our of the area to be spread.
SPREADER LOADING
WARNING –
Do not overload vehicle. Use chart below to calculate weight of material. Weights of material are an average for
dry materials.
Material
Weight Per Cubic Ft.
Rock Salt
35-40 lbs.
Sand/Salt Mix
95-120 lbs.
•
Be sure to comply with manufacturer’s maximum gross vehicle weight ratings.
•
Warning
– Never leave material in hopper for long periods of time as salt is hygroscopic and will attract atmospheric
moisture and harden up. When spreading sand mix, a 1:1 ratio for Sand/Salt mix is recommended to prevent the
material from freezing.
SPREADING TIPS
•
Never exceed 10 m.p.h. when spreading.
•
For a wider pass, increase spinner speed.
•
For a heavier pass, drive slower, or increase auger speed.
•
Never operate spreader near pedestrians.
•
Spread ice melters with the storm to prevent unmanageable levels of ice.
•
Calculate spread pattern when near vegetation.
V-Maxx 9500 CONTROL OPERATION
•
The Dual Variable Speed Control has dual finger-tip dials for maximum performance, digital system status with warning
protection and built-in vibrator switch.
•
To start, press power switch on controller and spreader will accelerate to speed set on spinner and auger dials.
•
To stop, press power switch on controller to off position.
•
Speed of auger and spinner may be adjusted separately to get desired flow and spread distance from spreader.
•
The Vibrator Switch is needed for dense material or to increase the flow to the auger. This eliminates bridging of material
in hopper.
•
In case spreader becomes jammed, it will go into an auto-reverse program to free itself. Auger display will show (AR)
while trying to clear obstruction.
Model # SP-9500
Summary of Contents for SnowEx SP-9500
Page 9: ...Trynex International 2009 L1185 5 9 Model SP 9500 Side and Bottom Views...
Page 10: ...L1185 Trynex International 2009 5 10 Auger Drive Assembly Parts Breakdown Model SP 9500...
Page 12: ...L1185 Trynex International 2009 5 12 Spinner Drive Assembly Parts Breakdown Model SP 9500...
Page 14: ...L1185 Trynex International 2009 5 14 Hopper Assembly Parts Breakdown Model SP 9500...
Page 16: ...Trynex International 2009 L1185 5 16 Frame Assembly Parts Breakdown Model SP 9500...
Page 36: ...Trynex International 2008 L1185 5 36 THIS PAGE INTENTIONALLY LEFT BLANK...