TRUE RESIDENTIAL
®
TEC_TM_155 REV. A
12/07/2021
Page 24 of 64
P R I O R T O I N S T A L L A T I O N
MAXIMUM
VERTICAL RISE
MAX RUN
3/8” I.D. Hose
84” (2,133.6 mm)
100’ (30.84 m)
1/2” I.D. Hose
(provided by TRUE)
48” (1,219.2 mm)
100’ (30.84 m)
Hose larger than 1/2" I.D. may require an external pump.
Vertical rise higher that 84” will require external pump.
INSTALLATION
1. Thread the 1/2” NPT connector into the drain
fitting. See fig. 1.
2. With the clamp on the hose, connect the clear
drain hose to the barbed fitting. See fig. 1.
3. Tighten the hose clamp.
NOTE: VERIF Y THE ICE MAK ER DR AINS
THROUGH T WO CYCLES WITHOUT ANY DR AIN
AL ARM DURING INSTALL ATION.
For more information, see “Drain Time Alarm"
(page 38).
FIG. 1.
Be sure to tightly clamp the drain line into the barbed fitting.
Thread sealant recommended.
1
2
4 8 ” M A X
( 1 , 2 1 9 . 2 m m )
8 4 ” M A X
( 2 , 1 3 3 . 6 m m )
E x t e r n a l
P u m p
1 / 2 ” I . D . H o s e
( P r o v i d e d
b y T R U E )
E x t e r n a l
P u m p
3 / 8 ” I . D . H o s e
( N o t p r o v i d e d
b y T R U E )
Summary of Contents for TUI-15-L-OP-D-DSK-103-H08
Page 2: ...TRUE RESIDENTIAL TEC_TM_155 REV A 12 07 2021 Page 2 of 64 THANK YOU FOR YOUR PURCHASE...
Page 8: ...TRUE RESIDENTIAL TEC_TM_155 REV A 12 07 2021 Page 8 of 64 N O T E S...
Page 26: ...TRUE RESIDENTIAL TEC_TM_155 REV A 12 07 2021 Page 26 of 64 N O T E S...
Page 42: ...TRUE RESIDENTIAL TEC_TM_155 REV A 12 07 2021 Page 42 of 64 N O T E S...
Page 62: ...TRUE RESIDENTIAL TEC_TM_155 REV A 12 07 2021 Page 62 of 64 N O T E S...
Page 63: ...15 TRUE ICE MACHINE INSTALL GUIDE TEC_TM_155 REV A 12 07 2021 Page 63 of 64 N O T E S...