True Professional 24 Series Installation Guide
25
Tools Needed:
• 2” Diameter PvC pipe (12” long). will need to be cut down to size when refrigeration unit is installed
• Silicone Caulk
When installing under counter tops use the dimensions in the diagram below (Image 1) for cutting into the counter top.
Silicone caulk around the edge of the PvC pipe after it has been installed.
It is recommended to purchase an aftermarket drip tray for overflow. The overflow bottle in the unit may be utilized by
purchasing a tray with a built in drain tube.
TAPPER UNIT INSTALLATION UNDER COUNTER TOPS
1
9
3
/
8
"
10
23
/
32
"
10
5
/
8
"
11
31
/
32
"
2
11
/
16
"
2
11
/
16
"
Drip tray
5/32”
12
13
/
32
"
13
3
/
4
"
Summary of Contents for TBC-24-R/L-OG-A
Page 13: ...NOTES ...
Page 38: ...NOTES ...
Page 57: ...NOTES ...
Page 58: ...NOTES ...
Page 59: ...NOTES ...