![True TBC-24-R/L-OG-A Installation Manual Download Page 29](http://html1.mh-extra.com/html/true/tbc-24-r-l-og-a/tbc-24-r-l-og-a_installation-manual_1175057029.webp)
True Professional 24 Series Installation Guide
23
23
6. Secure overlay panel to drawer panel using
appropriate size screws. (See image 6)
7. Reattach drawer gasket by pressing and snapping back
into place in gasket channel (See image 7)
8. Reattach drawer panel front to the drawer using four
screws. (See image 8).
Back of
drawer
Back of drawer
7
8
6
5a
Drawer Overlay Panel
Summary of Contents for TBC-24-R/L-OG-A
Page 13: ...NOTES ...
Page 38: ...NOTES ...
Page 57: ...NOTES ...
Page 58: ...NOTES ...
Page 59: ...NOTES ...