True Professional 24 Series Installation Guide
28
5. Remove the draft cap and run the chill hose to
the top of the draft standard. Hook the hose onto
the stainless tube to keep hose from falling out
(This hose will keep the draft standard cold).
(Images 5 & 6).
6. Reinstall the draft cap.
7. Hook up the pressure regulator to the CO
2
tank.
Using a adjustable wrench make sure the nut is
tight. (Image 7)
8. Place CO
2
tank in the unit using the black strap
provided. To secure the tank use one of the
screws from the evaporator cover. The tank can
go in either the left or right side back corner. Run
a hose from the regulator to the tapper (hose
not provided). Hook the beer hose to the tapper
making sure the rubber washer is between the
flanges. (Image 9)
9. Install the beer tapper onto the keg. The tapper
has notches that must line up. Once the notches
are lined up, turn the tapper to secure it to the
keg. Once secured, pull outward on the handle.
While pulling, press the tap lever down to engage.
Release the handle and the tapper should stay
engaged to the keg. (Images 8 & 9)
5
6
7
8
9
Beer Hose Connection
Summary of Contents for TBC-24-R/L-OG-A
Page 13: ...NOTES ...
Page 38: ...NOTES ...
Page 57: ...NOTES ...
Page 58: ...NOTES ...
Page 59: ...NOTES ...