![True Manufacturing Company TAC-14GS-HC-LD Installation Manual Download Page 10](http://html1.mh-extra.com/html/true-manufacturing-company/tac-14gs-hc-ld/tac-14gs-hc-ld_installation-manual_1175477010.webp)
TEC_TM_086 REV. B | EN
09/26/22
Page 10 of 24
AIR CURTAIN
www.truemfg.com
Cabinet Setup
Shelving
For ease of installation, install the lowest shelf first.
Shelving is adjustable for customer application. This cabinet meets the IEC Shelf Weight Capacity of 47lb/ft2 (230kg/m2).
WARNING!
Remember to follow the guidelines below when loading product:
Cantilever Shelving Installation
Cantilever shelves come packaged inside the unit. Leg leveling parts may be taped to the top of the shelf packaging. See fig. 1.
Fig. 1.
Leveling leg parts taped to shelf packaging.
Fig. 2.
Hook the shelf supports into the shelf standards.
TAC-72
Hook the shelf support tabs into the shelf standards in the rear corners and middle of the cabinet. See fig. 2.
• When loading, product may NOT block the air flow from the top (honeycomb) or at the bottom (stainless steel
evaporator cover).
• Product may NOT extend over the front edge of the shelves.
A
B
Summary of Contents for TAC-14GS-HC-LD
Page 21: ...TEC_TM_086 REV B EN 11 8 2022 Page 21 of 24 AIR CURTAIN www truemfg com NOTES...
Page 22: ...TEC_TM_086 REV B EN 09 26 22 Page 22 of 24 AIR CURTAIN www truemfg com NOTES...
Page 23: ...TEC_TM_086 REV B EN 11 8 2022 Page 23 of 24 AIR CURTAIN www truemfg com NOTES...
Page 24: ...11 8 2022 Page 24 of 24 TEC_TM_086 REV B EN www truemfg com BC_197311_9 22...