background image

EM-LON Operating Manual / Leaflet no. M375EV4 (3/2013)

12

For installation, wiring, and commissioning
observe the recognised technical regulations,
especially safety and accident prevention 
regulations.

For any wiring work follow the national and 
local regulations and guidelines for electrical
installation.

Danger!

Danger of electric shock! Do not touch any
live components!  Electrical equipment
carries a dangerous electrical voltage
during operation.

• Only skilled qualified electricians are

allowed to work on the electrical system.

• Switch off the power supply before 

working on any electrical equipment. 

Making connections

The EM-LON PCB has terminals for two bus cables
of a LonWorks network. Depending on the network
topology, controllers at the end of a chain may be
connected to one bus, controllers at other positions
in the chain may be connected to two buses.
Strip the insulation from at least two wires of the bus
cable, insert the bare wires into the terminals and
tighten the screws.
• Fix the bus cable to the casing using the wire

clamping bracket.

• Connect the shield of shielded cables to the 

SH terminals. Within a chain (channel) connect
the shield only at one point with the earth. 
Earthing the shield at every controller will 
lead to interferential voltages.

• To avoid reflections at the end of a chain 

(channel) use a terminator.

Recommended bus cables

Bus cables to TIA 568A, category 5
• Belden 8471 or 85102
• Cables to DOCSIS specification level IV
• JY(St)Y 2×2×0.8 (use only twisted pair for 

LON-A and LON-B)

1

2 3 4

1

2 3 4

1 Bus
2 LON-B
3 LON-A
4 SH (shield)

7

Wiring

Summary of Contents for EM-LON

Page 1: ...Operating Manual Leaflet no M375EV4 3 2013 The art of handling air Operating and Installation Manual EASYLAB Expansion module EM LON LonWorks interface for EASYLAB TCU3 controllers and TAM adapter mo...

Page 2: ...ion __________________ 5 Product overview and technical data ______ 5 Functional description ________________ 6 4 Transport storage and packaging ________ 6 5 LonWorks network variables ____________ 8...

Page 3: ...le it is essential to read this operating and installation manual before starting any work and to comply with it The manual must be given to the facilities manager when handing over the system The fac...

Page 4: ...he PCB Tighten the mounting screws and distance pieces only hand tight to avoid damage to the PCB or to the fixing points in the casing Foreign matter and liquids If liquid gets onto the PCB or inside...

Page 5: ...LON B LON A SH SH LON A LON B Technical data Supply voltage 5 V DC from the TCU3 controller or TAM adapter module Communication LonWorks transceiver FTT 10A Free Topology Twisted Pair Acceptable tempe...

Page 6: ...e and away from direct sunlight Temperature 10 C to 70 C Maximum humidity 90 non condensing Packaging Properly dispose of packaging material Functional description The EM LON expansion module suppleme...

Page 7: ...s_p x x Differential pressure setpoint value for the room nvoPressAct SNVT_press_p x x Differential pressure actual value for the room nvoLocalAlarm SNVT_switch x x x x x Single controller alarm nvoSu...

Page 8: ...nd outputs TCU3 Overview of additional data points for EM LON LonWorks interface firmware version 2 0 and TCU firmware version 3 0 Name of variable Data type FH RR TAM RR RMF TAM RMF Meaning nviSC_Loc...

Page 9: ...DampPosMin_FH nvoDampPosMin_RE nvoDampPosMin_RS nvoDampPosMin_TE nvoLocalAlarm nvoManOverride nvoMode nvoOccCmd nvoManOverride_R nvoMode_R nvoOccCmd_R nvoPressAct nvoPressAlarm nvoPressSet nvoSummaryA...

Page 10: ...pieces 1 into the corresponding openings in the TCU3 or TAM main PCB and tighten them hand tight only Step 2 Take the pin header 2 and push it from below through the EM LON PCB 3 just far enough such...

Page 11: ...d the holes for the distance pieces are above the distance pieces Then press the PCB onto the distance pieces In case the positions do not exactly line up check whether the pin header is still correct...

Page 12: ...work Depending on the network topology controllers at the end of a chain may be connected to one bus controllers at other positions in the chain may be connected to two buses Strip the insulation from...

Page 13: ...ommissioning Press the service pin push button and download the software for the EASYLAB LonWorks node The software for the EM LON expansion module is available for download on our website 2 Binding C...

Page 14: ...EM LON Operating Manual Leaflet no M375EV4 3 2013 14...

Page 15: ...EM LON Operating Manual Leaflet no M375EV4 3 2013 15...

Page 16: ...EM LON Operating Manual Leaflet no M375EV4 3 2013 16...

Reviews: