Installation Guide ROQSTAR
Document no. 130-103.44 11/2016 ENG
Seite 9 von 16
4.2.
Configuration
Proceed as follows for the first commissioning:
Order no. 006-130-101/102/104
1. Connect the power supply.
2. Connect the PC / notebook to one of the Ethernet ports 1-8 of the device.
3. The connected PC / laptop must have the following network settings:
►
Order no. 006-130-101/104
IP address: 192.168.1.10/24
►
Order no. 006-130-102
IP address: get automatically
4. Start the web browser and enter the LAN-IP address of the device.
5. Perform the desired configuration of the device.
6. Connect the Switch with your network devices.
5.
LED Display
With the LED display, you can perform an initial, rapid device diagnosis.
5.1.
System status LED
Order no. 006-130-100
LED
Colour
Activity
Operating state
V1
-
aus
power supply V1 is not connected
green
lights up
power supply V1 is connected
V2
-
off
power supply V2 is not connected
green
lights up
power supply V2 is connected
Order no. 006-130-101/102/104
LED
Colour
Activity
Operating state
PWR
-
off
Power supply is not connected.
green
lights up
Power supply is connected, device is supplied with power.
green
flashes with 1Hz
Indicates an error of the redundant power supply.
MOD
-
off
Device is off, out of service or device is booting.
green
lights up
Device is ready to operate.
green
flashes with 1Hz
Active web interface session.
green
flashes with
10Hz
Firmware update is being performed or
configuration is loaded / saved.
ERR
-
off
There is no error, device operates properly.
red
flashes with 1Hz
Configuration error:
- false user configuration
red
lights up
Fatal system error. Device is not ready to operate due to:
- memory errors
- not recognized Switch / Phy -
- error in an internal voltage