16
COMMISSIONING
COMMISSIONING
• The first operation of the shower is intended
to flush out any remaining unit debris and
to make sure the heater unit contains water
before the elements are switched on.
• Turn the valve spindle until it is in the
position shown in
(fig.16)
• Fit the trimplate.
• Turn the temperature control on the cover to
the position shown in
(fig.17)
.
! VERY IMPORTANT !
Before normal operation of
the shower, it is essential
the following commissioning
procedure is completed correctly.
IMPORTANT
DO NOT connect the 10-way
ribbon cable at this stage.
Fig.17
Fig.16
Temperature control
• Offer the cover to the unit.
• Carefully locate the cover tags into the guide
pockets on the backplate and make sure the
wires are not trapped.
• Guide the cover into position so that the
control spindle locates correctly (minor
adjustment may be necessary to align the
control and spindle).
• Should any difficulty arise, recheck the points
above.
• While applying slight pressure to the front
cover, secure in position with the three
retaining screws.
• Fit the flexible hose to the shower outlet
making sure the outlet of the hose is directed
to waste. Check the supplied sealing washer
is in place.
•
DO NOT attach the showerhead at this
stage.