![Triton T40i Installation And Operating Instructions Manual Download Page 11](http://html1.mh-extra.com/html/triton/t40i/t40i_installation-and-operating-instructions-manual_1169452011.webp)
9
T40i
'Dogs'
REPLACING THE COVER AND
TESTING
PROCEDURE
1. Make sure the switch spindle adaptor ‘dogs’
are positioned as shown
(fig.12)
.
2. Position the control knob on the cover to
‘stop’
(fig.15)
.
3. Offer the cover to the unit and plug the
loose neon into the bracket that is located
inside the cover
(fig.13)
.
4. Place the cover squarely over the backplate
and guide into position so that the
extended ‘dogs’ of the spindle adaptor slot
into the recess of the control knob. Should
any difficulty arise, recheck the points
above.
5. Secure the cover in position with the two
retaining screws.
6. Turn on the water supply at the mixer valve/
tap and adjust to a normal showering
temperature.
7. Make sure the control knob is at the ‘stop’
position. Switch on the electricity supply at
the isolating switch.
8. Turn the control knob to the ‘start’ position
(fig.14)
. The pump will start and the neon
will illuminate. Check for an increase in
water flow. Turn the control knob to the
‘stop’ position
(fig.15)
. The water flow
should decrease. Turn off the water at the
mixer valve/tap.
9. The installation should be checked for any
leaks from the hose connections.
Fig.13
Fig.12
WARNING
COVER RETAINING SCREWS
ONLY
the
SUPPLIED SCREWS
should be
used. The use of non supplied screws
WILL
invalidate product specifications & warranty.