E
D
G
G
F
1
2
3
4
A
B
B
A
C
C
8
Installation
Rack Mounting
Mount your equipment in either a 4-post or 2-post rack or rack enclosure. The user must determine the fitness of hardware and
procedures before mounting. If hardware and procedures are not suitable for your application, contact the manufacturer of your rack or
rack enclosure. The procedures described in this manual are for common rack and rack enclosure types and may not be appropriate for all
applications.
CAUTION: The equipment should be installed onto the rack rails at a height <1 m (36 in.).
If an external battery pack is to be used, it should be installed first in the lower part of the rack. Be sure to follow
instructions for
Configuring External Battery Packs
in this manual and in the
BP192V12RT3US Owner’s Manual
before proceeding with UPS installation.
4-Post Mounting
1
The included plastic pegs
A
will temporarily support the empty
rack-mount shelves
B
while you install the permanent mounting
hardware. Insert a peg into the third hole from the top on the
front end of each bracket. On the rear end, insert a peg into the
center hole. (Each front bracket has 6 holes and each rear
bracket has 5 holes.) The pegs will snap into place.
After installing the pegs, expand each shelf to match the depth
of your rack rails. The pegs will fit through the square holes in
the rack rails to support the shelves. Refer to the rack unit
labels to confirm that the shelves are level in all directions.
Note:
The support ledge of each shelf must face inward.
2
Remove the pegs at the front end of each bracket. Secure the
shelves
B
to the mounting rails permanently using the included
screws and cup washers
C
as shown. Place 2 screws at the
front of each rail (4 total) and 2 screws at the back of each rail
(4 total). Tighten all screws before proceeding.
Note:
The rear pegs can be left in for installation, but the front ones
must be removed before the bracket is secured by screws.
WARNING!
Do not attempt to install your UPS until you have
inserted and tightened the required screws. The plastic
pegs will not support the weight of your UPS.
3
Attach your UPS’s mounting brackets
D
to the forward
mounting holes
E
of the UPS using the included hardware
F
.
The mounting bracket “ears” should face forward.
Note:
It is recommended you remove the UPS internal batteries prior to
installation. Doing so will remove excess weight and allow for safer
handling.
4
With the aid of an assistant, lift your UPS and slide it into the
shelves. Attach the UPS mounting ears to the front mounting
rails with user-supplied screws and washers
G
. Tighten all
screws securely.
Note:
To install battery pack trays inside the UPS, refer to instructions
5-8 in the
Internal Battery Rotation
section.
Summary of Contents for SmartOnline AG-0358 Series
Page 106: ...106 0 3 smart Tripp Lite BP192V12RT3US...
Page 108: ...108 BP192V12RT3US 1 2 3 4 1 2 3 Smart Battery 4...
Page 109: ...109 1 2 5 7 6 8 5 6 7 8 1...
Page 122: ...122 0 5 60 60 0 5 50 60 50 0 5 FREQUENCY CONVERSION FREQUENCY CONVERSION...
Page 133: ...1 2 5 6 9 7 8 133 5 6 7 8 9 1...
Page 134: ...1 5 3 134 tripplite com support 1 2 2 3 4 3 2 5 1...