2
Table of Contents
1. Introduction
3
Features
3
2. Important Safety
4
Instructions
Installation and
4
Location Warnings
Connection Warnings
5
Battery Warnings
5
3. Battery Cabinet Installation 7
3.1 Preparation
7
3.2 Transportation
7
3.3 Mechanical Check
8
3.4 Internal Wiring (Typical)
8
3.5 Preliminary Electrical Check 8
(After Battery Installation)
3.6 Battery Cabinet Placement
9
3.7 Electrical Connection
9
3.8 Final Electrical Check
10
4. Operation and Charging
11
4.1 Determine Charging Voltages 11
4.2 Initial Charge
11
4.3 Operational Check
11
5. Maintenance
12
5.1 Maintenance Schedule
12
5.1.1 Quarterly Check
12
6. Mechanical Data
12
6.1 Physical Measurements
12
6.2 Battery Requirements
13
7. Installation
14
7.1 Battery Pre-Installation
14
7.2 Cable Jumpers and
15
Internal Wiring
7.2.1 Included Cable Jumpers 15
Specifications
7.2.2 Installing Cable Jumpers 15
to Battery Terminals
7.2.3 Battery Cabinet
17
Internal Wiring
7.2.4 Battery Cabinet
18
Parallel Installation
7.3 Battery Installation
19
7.4 Installation Specifications
37
7.4.1 Installation and
37
Floor Loading Information
7.4.2 Recommended Torque
37
8. Storage and Service
38
9. Warranty and
39
Product Registration
18-07-363-933856.indb 2
8/1/2018 4:55:36 PM