5. Installation
Figure 5-27: Wiring diagram for BP240V100L (40 batteries installed)
When the battery installation and connection is completed, use a multi-meter or other instrument to check if the voltages
between BAT+ and N, N and BAT- are normal. If normal, lock the chassis cover.
Note:
This manual may be downloaded
in color at tripplite.com, which shows
the cables in corresponding colors:
Red = Positive
Blue = Center Tap
Black = Negative
Summary of Contents for BP240V100
Page 31: ...31 Figure 5 21 5 Installation Figure 5 22 11 Reinstall all covers and screws Figure 5 22...
Page 46: ...46 Figure 5 43 Model BP240V100L NIB Figure 5 44 5 Installation...
Page 47: ...47 Figure 5 45 12 Reinstall all covers and screws Figure 5 45 5 Installation...
Page 60: ...60 6 Operation and Configuration of S3M UPS Models and Battery Cabinets...
Page 114: ...114 Figura 5 43 Modelo BP240V100L NIB Figura 5 44 5 Instalaci n...
Page 115: ...115 Figura 5 45 12 Vuelva a instalar todas las cubiertas y tornillos Figura 5 45 5 Instalaci n...
Page 128: ...128 6 Operaci n y Configuraci n de Modelos de UPS S3M y Gabinetes de Bater as...
Page 183: ...183 Figure 5 43 mod le BP240V100L NIB Figure 5 44 5 Installation...
Page 198: ...198 6 Fonctionnement et configuration des mod les d onduleur S3M et des armoires de batteries...
Page 207: ...207...
Page 208: ...208 1111 W 35th Street Chicago IL 60609 USA tripplite com support 20 11 074 93 3BF8_RevB...