![Tripp Lite BP240V100 Owner'S Manual Download Page 2](http://html1.mh-extra.com/html/tripp-lite/bp240v100/bp240v100_owners-manual_1165267002.webp)
2
Table of Contents
1. Introduction
3
1.1 Features
3
1.2 UPS and Battery Cabinet
4
Compatibility Chart
2. Important Safety Instructions
5
2.1 Installation and Location Warnings 5
2.2 Connection Warnings
5
2.3 Battery Warnings
6
2.4 Standards Compliance
6
3. Battery Cabinet Installation
7
3.1 Preparation
7
3.2 Transportation
7
3.3 Mechanical Check
7
3.4 Package Contents
8
3.5 Internal Wiring (Typical)
8
3.6 Battery Cabinet Placement
9
3.7 Electrical Connection
9
3.8 Final Electrical Check
10
4. Mechanical Data
10
4.1 Physical Measurements
10
4.1.1 Dimensions for BP240V65,
10
BP240V65-NIB, BP240V100,
BP240V100-NIB
4.1.2 Dimensions for BP240V65L,
12
BP240V65L-NIB, BP240V100L,
BP240V100L-NIB
4.2 Physical Requirements (All Models) 14
5. Installation
15
5.1 Unpacking and Inspection
15
5.2 Selecting Installation Position
16
5.3 Power Cables
17
5.3.1 Cable Sizes
17
5.4 Battery Cabinet Connections –
17
Models BP240V65, BP240V65-NIB,
BP240V100, BP240V100-NIB
5.4.1 Remove the Chassis Shell
18
5.4.2 Battery Installation 18
and Connection
5.4.2.1 Battery Installation
22
and Setup: Models
BP240V65-NIB,
BP240V100-NIB
5.5 Battery Cabinet Connections –
32
Models BP240V65L,
BP240V65L-NIB, BP240V100L,
BP240V100L-NIB
5.5.1 Remove the Chassis Shell
32
5.5.2 Battery Installation and
33
Connection
5.5.2.1 Battery Installation
37
and Setup: Models
BP240V65L-NIB,
BP240V100L-NIB
5.6 Multiple Battery Pack Connections 48
6. Operation and Configuration
52
of S3M UPS Models
and Battery Cabinets
6.1 S3M UPS Compatibility with
52
BP240V65 to BP240V100L
Battery Cabinets
6.2 Configuring 10-20K UPS for
53
Specific Battery Cabinets using
the LCD Display
6.2.1 S3M 10-20K UPS Home Display
53
6.2.2 Setting
55
6.2.3 Battery Setup
56
6.2.4 Confiuring the S3M 10-20-NIB
57
and Optimizing Charging of
BP240V65/V65L and
BP240V100/V100L
Battery Cabinets
6.3 Configuring 25-100K UPS for
59
Specific Battery Cabinets
Using the LCD Display
6.3.1 S3M 25-100K UPS Home Display
60
6.3.2 Setting
60
6.3.3 Battery Setup: Click BATT Setup
62
6.3.4 Configuring the S3M25-100K UPS
and Optimizing Charging of the
BP240V65/V65L and
BP240V100/V100L Battery Cabinets 63
6.4 Configuring Reference Tables 66
7. Specifications
67
7.1 Battery Cabinet Specifications 67
8. Storage
67
9. Service and Warranty
68
Summary of Contents for BP240V100
Page 31: ...31 Figure 5 21 5 Installation Figure 5 22 11 Reinstall all covers and screws Figure 5 22...
Page 46: ...46 Figure 5 43 Model BP240V100L NIB Figure 5 44 5 Installation...
Page 47: ...47 Figure 5 45 12 Reinstall all covers and screws Figure 5 45 5 Installation...
Page 60: ...60 6 Operation and Configuration of S3M UPS Models and Battery Cabinets...
Page 114: ...114 Figura 5 43 Modelo BP240V100L NIB Figura 5 44 5 Instalaci n...
Page 115: ...115 Figura 5 45 12 Vuelva a instalar todas las cubiertas y tornillos Figura 5 45 5 Instalaci n...
Page 128: ...128 6 Operaci n y Configuraci n de Modelos de UPS S3M y Gabinetes de Bater as...
Page 183: ...183 Figure 5 43 mod le BP240V100L NIB Figure 5 44 5 Installation...
Page 198: ...198 6 Fonctionnement et configuration des mod les d onduleur S3M et des armoires de batteries...
Page 207: ...207...
Page 208: ...208 1111 W 35th Street Chicago IL 60609 USA tripplite com support 20 11 074 93 3BF8_RevB...