59
7. UPS Operation
7.3.2 Transfer Critical Load from Maintenance Bypass to Line Mode
Step 1
Turn ON the battery breaker (external battery cabinet).
Step 2
Single input model:
Turn ON the Q1 Input 1 breaker.
Single input model:
Turn ON the Q1 Input 1 breaker.
Dual input model (Option):
Turn ON the Q1 Input breaker and Q2 Input breaker.
00KVA/120KVA
Dual input model (Option):
Turn ON the Q1 Input breaker and Q2 Input breaker
160KVA/200KVA
Step 3
Go to the LCD INFORMATION Menu. Choose “SYSTEM” to ensure that Bypass Mode is enabled (“Power By Bypass”). If
Bypass Mode is disabled, set it to “enabled” through the SETUP menu and confirm the UPS is operating in Bypass Mode
before proceeding.
Step 4
Proceed to Step 5.
Turn ON the Q3 Output breaker.
S3M160KX/S3M300KX
(160 kVA/200 kVA) Models
S3M100KX/S3M120KX
(100 kVA/200 kVA) Models
S3M160KX/S3M300KX
(160 kVA/200 kVA) Models
Q1
Input 1
Q1
Input 1
Q1
Input 1
Q1
Input 1
Q2
Input 2
Q2
Input 2
S3M100KX/S3M120KX
(100 kVA/200 kVA) Models
S3M160KX/S3M300KX
(160 kVA/200 kVA) Models
2018/01/01
Q3
Output