22
4. Control Panel and LCD Operations
4.2 LCD Screen Description
4.2.1 Initial Screen
Upon powering on, the UPS will execute POST (Power-On Self-Test). The initial screen (shown below) will display for approximately 5
seconds.
Online UPS
Figure 4.2 Initial Screen
4.2.2 Main Screen
After initialization, the main screen will display.
Figure 4.3 Main Screen
The Main Screen is divided into six sections:
1
UPS Operation Mode:
Shows UPS current operation mode and status.
2
UPS Flow Chart:
Shows current flow chart and measurement data.
3
Main Menu:
Touch each icon to enter submenu. Refer to Figure 4.4 for menu tree.
Figure 4.4 Menu Tree
4
UPS Power Rating:
Shows UPS power rating.
5
Date and Time:
Shows current date and time.
2
1
4
6
3
Main
HOME
CONTROL
MEASUREMENT
SETUP
INFORMATION
EVENTS
2018/01/01
5
Summary of Contents for 037332225436
Page 354: ...354 ...
Page 355: ...355 ...
Page 356: ...356 1111 W 35th Street Chicago IL 60609 USA tripplite com support 20 03 223 93 3B5B_RevB ...