background image

 

www.trinit

Tongu

 

A
u

 

A

 

L
s

 

T

 

Grom
(1150

tyhighway.com

ue Wirin

Attach the M

nderneath t

Attach the lig

Left side ha

trap. Pilot h

The passeng

5/8” Strap
(117522G)

Main Harnes

(118165B

met 

79B) 

ng 

Main Harne

tube and th

ghting clea

arnesses ar

holes are pr

ger side req

 

Ju
(1

ss 

B) 

F

ess along th
hen into left 

rance Front

re attached
rovided. 

quires 3/8” l

unction Box 

15481B)

(

17

Figure 7 

he inside o

top frame r

t Harness s

d along the 

loop straps

1/4” x 1” Scr
(116891G)

of tongue a

rail. 

system simi

 inside of 

 only. 

rew 

3/8” Strap 
(117521G)

Revisio

as shown a

ilarly.  

the square

Front H
(118163

on D October

 

above. Cont

e tube with 

Harness 

3B) 

r 2017 

tinue 

5/8” 

Summary of Contents for VORTEQ Premium Lighting

Page 1: ...Revision D October 2017 VORTEQ Trailer TMA 12 24 Premium Lighting Kit Addendum PN 115240...

Page 2: ...7520 uctions are and repair of ies specified pecified sys on from thes eer This s deral Highw ystem under tatives are a orker overs ntact Trinity supersede a s in this ma way at the t Trinity High Inc...

Page 3: ...Lighting Assembly Check List 7 Vorteq Premium Lighting Overview 10 Wire Harness Plug Connections 13 Clearance Marker Lamp Harness Identification 14 Clearance Marker Light Connections 15 Lighting Harne...

Page 4: ...cts which are O NOT use system durin 3 t level of cus upporting doc ained from th 888 323 1 214 3 product i www trin s hting Kit is e nd state crite sembling th embly of the the applicab eviation from...

Page 5: ...in this recautions w pment or Vo ection should 4 your Vorte the risk of in system is a ve Highway uck and may operations wing basic c s and tires mainly cov tructions tho maintaining esult in serio s...

Page 6: ...event of a ve FHWA e maintain ughly and c and Import call Trinity H s Highway p ng maintain omingle par Highway s hey been sing unspec his warning with an UNA e Vorteq T Vorteq Traile local specif ur...

Page 7: ...a genera g on specif ppropriate h are neede highway au e system a 6 Lighting pair details r standard lay with these with these in or render the HEAD DRIVER 3 16 AL l recommen fic site co highway au ed...

Page 8: ...i JUNCTION B 115481B CLEARANCE 115621B REAR SILL H 118167B CLEARANCE 115622B CLEARANCE 115057B 7 st OX E ROUND AMB HARNESS E ROUND RED E RECT GASKE MA x 1 118 BER CL x 2 115 TA x 1 115 115 D RE x 2 11...

Page 9: ...4 x 3 ICC LICENSE 118161B LICENSE LAM 113758B FRONT LIGHT 605497G SCREW 1 4X1 116891G HARNESS CL 114102B 8 E HARNESS MP COVER T BRACKET 1 SELF TAPP LAMP LIC x 1 115 LIC x 1 113 RE x 2 605 PING GR x 7...

Page 10: ...r Trinity or have th repairs us 9 OCK 1 4 G AT 10 Highway p ng maintain omingle par Highway s hey been sing unspec BO x 8 113 SC x 12 116 S x 2 parts that a ing or repa rts from oth systems Su deemed...

Page 11: ...ht Bracke m mium Lig m illustratio ard equipped nching cable Left e Loop w et M Ha ghting O on Front F d systems r s A Cable Loo ounting ardware Cable Grommet 10 Overview Primary lig Figure 1 route ca...

Page 12: ...Clip Lock Nut Lock Wash ce Light Light Gromm on rear P F Det 18165B e Harness 118167B s Wire H er Rear Brack met 11 Primary ligh Figure 2 tail C Left ICC Lic Harness 118 Light ket hting com cense 8161...

Page 13: ...g 626B ed above to f Detail E e Li acket License Pla Brack ght facilitate har Light G Cl ight Gromme Licens Light B ate ket Mounting Revisio rness attachm Grommet Tail Light learance Lig et G se Plate...

Page 14: ...jace arness B onnecti otector nector into f e available ent unused Main Ha PN 1181 Cleara Ligh Gask 13 ons female sock at each wir d location arness 165B ance ht ket Add Harn Sill H ket Plug sh re Use...

Page 15: ...F nce lights a d forward to mp Harn ve the long nction box s Rear Cle ve the shor 8164B Fender Cl are 54 lon o the fender 14 ness Ide g two wire stud connec earance L rt 8 length learance ng PN 1181...

Page 16: ...d ion If the ot work g ght Conn sure to pay oth the plug must matc d properly plug is conn Plug 15 nections y attention t g and the la ch Firmly nected to the s to plug orie amp have p press the e lam...

Page 17: ...sembly F F Wire Tie 17784B Main Harn 118165B 16 Figure 3 Figure 4 Grommet 115079B ness Fig Main H 11816 Revisio gure 6 Gro 115 Us fee thr Harness 65B Harnes 11410 on D October ommet 5079B e fish tape...

Page 18: ...clea arnesses ar holes are pr ger side req Ju 1 p ss B F ess along th hen into left rance Front re attached rovided quires 3 8 l unction Box 15481B 17 Figure 7 he inside o top frame r t Harness s d al...

Page 19: ...www trinit Harne 3 8 S tyhighway com ess Rout Figure Figure Strap 117521 m ting on T e 8 e 10 1G Tongue 18 Assembly 5 8 St Revisio Figure 9 Figure 11 trap 117522G on D October G r 2017...

Page 20: ...re m and pass M ortant Finis 3 16 117 ail B een Main Harne F sh all wiring 6 Tie 784B 19 ess throug Figure 12 and routing gh to End S before attac Gromme 115079B R Revisio Sill Harnes ching lights See...

Page 21: ...Locks Clip Locks Head Impo Detail Clip Lo m on End S ortant Finis A ock Sill Harnes F sh all wiring 20 s one per Figure 13 and routing r side on t before asse Revisio the Outsid embling light on D Oct...

Page 22: ...Light As Wiring not ortant Finis ortant Use Lock Washer 118085G Red Reflector 116629B sembly shown for sh all wiring F spray clean r Taillig Gromm 115088 r 21 and Ho r clarity and routing Figure 14 n...

Page 23: ...B 3 16 Tie s ug Harness arance Mark sure to pass nnections ar Wire Ties to F r 3 16 T F 22 into Lamp ker Light Con s Harness t re made see o hold harne Figure 16 Tie Cle Har Figure 15 and then m nnect...

Page 24: ...Marke Hex Bolt 113694G Flat W 117 Front Lig ce Round Gro 117 nd Amber 117014B m er Light As t Washer 7014B ght Bracket 117014B ommet 7014B Reflect 117 ssembly F tor Amber 7014B 23 Figure 17 Lock 117...

Page 25: ...3 License Brack 11375 24 Figure 18 hts and Bra seat Gromm lights as sh Light ket 57B License G 11505 acket to Pa met into hole hown to facil Gasket 56B License Cov 1137 Hex L 1153 Fla 11 Revisio anel...

Page 26: ...clamps on s through ction box t s by color o ortant Eac to the appro ctions nto harnes rubber gro o tongue p on each te Figure 21 ch Terminal opriate Term Truc 1 25 sses ommets plate rminal stu has a...

Page 27: ...ensure wire loops are clear of tires suspension and obstructions Inspect Ring Terminal placement at the Junction Box to ensure that Ring Terminals are tight and are not touching adjacent Terminals Che...

Page 28: ...www trinit DWG 618787 1 of 3 tyhighway com m 27 Revisio on D October r 2017 Lighting Assembly LED 12V SAE Vorteq...

Page 29: ...www trinit DWG 618787 2 of 3 tyhighway com m 28 Revisio on D October r 2017...

Page 30: ...www trinit DWG 618787 3 of 3 tyhighway com m 29 Revisio on D October r 2017...

Page 31: ...www trinit DWG 618793 1 of 3 tyhighway com m 30 Revisio on D October r 2017 Lighting Assembly LED 24V SAE Vorteq...

Page 32: ...www trinit DWG 618793 2 of 3 tyhighway com m 31 Revisio on D October r 2017...

Page 33: ...www trinit DWG 618793 3 of 3 tyhighway com m 32 Revisio on D October r 2017...

Page 34: ...www trinityhighway com 33 Revision D October 2017 Notes...

Page 35: ...www trinityhighway com 34 Revision D October 2017 Notes...

Page 36: ...more complete information on Trinity Highway products and services visit us on the web at www trinityhighway com Materials and specifications are subject to change without notice Please contact Trini...

Reviews: