TrinityHighway.com
23
Created November 2021
STEP 7A
SRT™ 31 System (34’-4 1/2” Long)
SRT™-3 Guardrail Assembly
C
10967G
1 EA
Reference Drawing SS436
1. Assemble the SRT™-3 Guardrail (Part C) as shown above.
2. Ensure the SRT™-3 Guardrail is straight between Posts 7 and 5 and the
height is 31” above grade.
3. Ensure any gap between the back of the SRT™-3 Guardrail and the face of
the SYTP
®
or SRT™ flange protector does not exceed 2” [50 mm].
4.
Ensure SRT™-3 Guardrail is lapped in the direction of traffic
immediately adjacent to the SRT™ 31 installation
.
5. Ensure 5/8” x 1.75” countersunk HD bolt (Part S) is used to attach the SRT™-
3 Guardrail to SYTP
®
6.
6. Tighten all threaded hardware to a snug position with a minimum of two (2) bolt
threads protruding beyond the nut.
S
4419G
1 EA
U
3360G 8 EA
BB
3340G
9 EA
Use only Trinity Highway parts
that are specified herein for the
SRT™
31
System
for
assembling, maintaining, or
repairing the SRT™ 31 System.
Do not utilize or otherwise
commingle parts from other
systems even if those systems
are Trinity Highway systems.
WARNINGS
Do not attach the SRT™-3 Guardrail to post 5. Do not place anything
between the post bolt head and the SRT™ 31 Anchor Guardrail that
would prevent the bolt from pulling through (i.e. no rectangular washer
or delineator). Ensure the SRT™-3 Guardrail is straight between posts
7 and 5. Failure to follow this warning could result in serious injury or
death in the event of a vehicle impact with the system.
Do NOT alter the lap orientation of the
length-of-need guardrail when
assembling a downstream/trailing end
SRT™ 31 System.
.