R11 2x2
17
2.7.5.10. Remove the four hex head capscrews (57) which attach the
pedestal cover (18) to the pedestal (17). Remove the pedestal
cover. Remove gasket (34) from the pedestal.
2.7.5.11. Position the two oil rings (22) into the grooves of the rotor oil slinger
(19) and the oil slinger (20).
2.7.5.12. Thread the three eyebolts into three evenly spaced holes in the rotor
cover (4). Adjust the eyebolt nuts until flush against the rotor cover.
2.7.5.13. Using a sling, lift and guide the rotor cover (3), the driveshaft (5) and
the bearings out of the pedestal (17). Being careful not to damage
rotor cover hub, place the assembly on a flat surface or mount with
rotor cover upward.
2.7.5.14. Match mark the location of each of the twelve socket head cap
screws (7) which secure the rotor cover (4) to the rotor (3).
2.7.5.15. Remove the twelve socket head capscrews (7) and install the rotor
guide pins. Evenly thread three of the socket head capscrews (7)
into the threaded holes in the rotor cover until the rotor cover is
released from the rotor. Replace the three capscrews with three
eyebolts.
2.7.5.16. Holding the pick-up tube (1) centered in the rotor cover (4), lift the
rotor cover.
2.7.5.17. Guide the pick-up tube out of the rotor cover. Place the rotor cover
on a flat surface with the seal mating ring visible. Remove the rotor
guide pin.
2.7.5.18. Grasping the outside diameter of the seal mating ring (78), pull to
remove from the rotor cover (4). If unable to remove by hand, install
the seal mating ring puller and evenly thread the two capscrews
against the rotor cover until the seal mating ring is free of the rotor
cover.
2.7.5.19. Remove the seal mating ring o-ring (69) and rotor o-ring (12).
2.7.5.20. Being careful not to damage rotor lip, position assembly with shaft
up and vertical.
2.7.5.21. Remove the excluder (85). Using the bearing nut adaptor, remove
the bearing nut (46) and put to the side to be used during bearing
assembly. Remove the outer race of the radial bearing (13) and the
outer ring of the spacer set (23).
Summary of Contents for Roto-Jet R11
Page 1: ...Disassembly Assembly Manual R11 2x2 RJ DA 3 11 19 ...
Page 9: ...R11 2x2 6 2 3 1 Model R11 Dimensional Drawing ...
Page 29: ...R11 2x2 26 Figure 4 0 ...
Page 33: ...R11 2x2 30 7 MAINTENANCE RECORD DATE SERIAL NO MAINTENANCE RECORD BY ...
Page 34: ...R11 2x2 31 8 APPENDIX A When using the swivel hoist use in place of this lifting eye ...